VALVE CLEARANCE CHECK AND ADJUSTMENT


note The valve clearance check and adjustment should be done when the engine is cold.
1.Remove the engine air intake pipe.
2.Remove the inlet manifold.


3.Use the special tool fuel injection pipe wrench (MB992188) to remove the fuel injection pipe.
caution Leaked fuel on parts causes a decrease in function and burning. Therefore, Place waste to absorb leaked fuel.
4.Remove the timing belt cover.
5.Remove the rocker cover.

6.Align the camshaft sprocket timing marks and set the No. 1 cylinder at top dead centre.
caution The crankshaft should always be turned in a clockwise direction.

7.Measure the valve clearance.
If the valve clearance is not as specified, loosen the rocker arm lock nut and adjust the clearance using a thickness gauge between the cam shaft and the roller while turning the adjusting screw.
Standard value (cold engine):
    Inlet valve: 0.09 mm
    Exhaust valve: 0.14 mm

8.While holding the adjusting screw with a screwdriver to prevent it from turning, tighten the lock nut to the specified torque using a valve adjusting socket. (MB992046)
Tightening torque: 15 ± 3 N·m
caution Pay special attention that the tightening torque is not beyond this valve. If the tightening torque is beyond the valve, the valve stem would possibly bend.
9.Turn the crankshaft 360° clockwise to bring No. 4 cylinder to the top dead centre position.

10.Measure the valve clearances at the places indicated by arrows in the illustration. If the clearance is not within the standard value, repeat steps 7 and 8 above.


11.Apply specified sealant to the section of the semi-circular packing shown in the illustration.
Specified sealant: Three bond 1217G or equivalent
12.Install the rocker cover.
13.Install the timing belt cover.


14.Use the special tool fuel injection pipe wrench (MB992188) to tighten the fuel injection pipe to the specified torque.
Tightening torque: 35 ± 5 N·m
caution
  • The reinstallation histories of the removed injection pipe are up to five times. To count how many times the injection pipe is reinstalled, record the number of the reinstallation histories on the service booklet by adding this latest number of the histories, which is usually "1", to the previous one. Use a new injection pipe when the total reinstallation history numbers reach five times, or when the injector or common rail is replaced. In this case, record "a new injection pipe, the number of the reinstallation histories is zero" on the service booklet.
  • When the injection pipe is reinstalled, confirm there is no foreign material on the seal surface or in the pipe and then install it not to deviate from the axis, fitting the seal surface.
15.Install the inlet manifold.
note Install a new gasket
16.Install the engine air intake pipe.
17.Confirm there is no fuel leak from the joint for the injection pipe (Refer to GROUP 13C - On-vehicle Service - Fuel Line Leak Check ).