Shift Solenoid Valves A and B Test (4AT)
Shift Solenoid Valves A and B Test
| 1. | Disconnect the shift solenoid valves A and B connector.
|
| 2. | Measure shift solenoid valve A resistance between the No. 1 terminal of the shift solenoid valves A and B connector and body ground, and measure shift solenoid valve B resistance between the No. 2 terminal and body ground.
|
| 3. | Replace the shift solenoid valves A and B if either resistance is out of standard. |
| 4. | If the resistance is within the standard, connect the No. 1 terminal of the shift solenoid valve A to the battery positive terminal. A clicking sound should be heard. Connect the No. 2 terminal to the battery positive terminal. A clicking sound should be heard. Replace the shift solenoid valves A and B if no clicking sound is heard when either terminal is connected to the battery terminal. |