DTC Troubleshooting: 8 (4AT)
DTC Troubleshooting: 8
| DTC 8: | Problem in Shift Solenoid Valve B Circuit |
NOTE:
- Record all freeze data before you troubleshoot.
- The illustration shows the example of connector terminal arrangement; connector terminal arrangement varies with the models.
| 1. | Turn the ignition switch OFF. |
| 2. | Disconnect PCM connectors A (31P) and C (22P). |
| 3. | Turn the ignition switch ON (II). |
| 4. | Measure the voltage between PCM connector terminals C4 and A23 or A24.
Is there voltage? YES - Repair short to power in the wire between PCM connector terminal C4 and the shift solenoid valve B.n NO - Go to 5. |
| 5. | Turn the ignition switch OFF. |
| 6. | Measure the resistance between PCM connector terminals C4 and A23 or A24.
Is there 12-25 W? YES - Check for loose terminal fit in the PCM connectors. If necessary, substitute a known-good PCM and recheck.n NO - Go to 7. |
| 7. | Check for continuity between PCM connector terminal A23 and body ground, and between terminal A24 and body ground.
Is there continuity? YES - Go to 8. NO - Repair open in the wires between PCM connector terminals A23 and A24, and ground (G101), or repair poor ground ( G101).n |
| 8. | Disconnect shift solenoid valves A and B connector (2P). |
| 9. | Check for continuity between PCM connector terminals C4 and A23 or A24.
Is there continuity? YES - Repair short to ground in the wire between PCM connector terminal C4 and the shift solenoid valve B.n NO - Go to 10. |
| 10. | Measure the resistance between the No. 2 terminal of the shift solenoid valves A and B connector and body ground.
A and B CONNECTOR (2P)Terminal side of male terminalsSH B (GRN/WHT) Is there 12-25 W? YES - Check for an open in the wire between PCM connector terminal C4 and the shift solenoid valve B.n NO - Replace the shift solenoid valves A and B.n |