M/T Mainshaft Reassembly (D17A M/T)
M/T Mainshaft Reassembly
Exploded View
SYNCHRO
SLEEVE3RD GEARMAINSHAFT4TH GEAR5TH GEAR5TH SYNCHRO HUBSYNCHRO
SPRINGSYNCHRO RING3RD/4TH
SYNCHRO
HUBSYNCHRO SPRINGNEEDLE BEARING
Check for wear and operation.BALL BEARING
Check for wear and
operation.
Note the direction of
installation.TAPERED RINGSPACER COLLARSYNCHRO SPRINGSYNCHRO SPRINGSYNCHRO RINGNEEDLE BEARING
Check for wear and operation.STOPPER RINGNEEDLE BEARING
Check for wear and
operation.SYNCHRO RINGSPACER COLLAR
Special Tools Required
Attachement, 42 x 47 mm ( 07746-0010300)
NOTE: Refer to the Exploded View as needed during this procedure.
| 1. | Clean all the parts in solvent, dry them, and apply lubricant to all contact surfaces except the 3rd/4th and 5th synchro hubs. |
| 2. | Install the 3rd gear, its bearing, and the 3rd gear synchro ring and synchro spring on the shaft. |
| 3. | Support 2nd gear (A) on steel blocks, then install the 3rd/4th synchro hubs (B) using the special tools and a press (C).
|
| 4. | Install the 3rd/4th synchro sleeve (D) by aligning the stops (E) of the 3rd/4th synchro sleeve and hub. After installing, check the operation of the 3rd/4th synchro hub set. |
| 5. | Install the 4th gear synchro spring and ring, 4th gear and its bearing, the spacer collar, and 5th gear and its bearing on the shaft. |
| 6. | Install the 5th synchro hub (A) using the special tools and a press (B).
|
| 7. | Install the 5th synchro sleeve. |
| 8. | Install the ball bearing (A) using the special tools and a press (B).
|