A/T Shift Lock Solenoid Test (5AT)
A/T Shift Lock Solenoid Test
| 1. | Remove the shift lever console panel. |
| 2. | Remove the A/T shift switch/shift lock solenoid/park pin switch connector (A) from the shift lever bracket base, then disconnect the connector. NOTE: The illustration shows LHD model; RHD is symmetrical.
male terminals |
| 3. | Connect the battery positive terminal to A/T shift switch/shift lock solenoid/park pin switch connector terminal No. 6, and connect battery negative terminal to the connector terminal No. 7. NOTE: Do not connect the connector terminal No. 7 to the battery positive terminal or you will damage the diode inside the shift lock solenoid. |
| 4. | Check that the shift lever can be moved from the P position. Release the battery terminals from the connector terminal, move the shift lever back to the P position, and make sure it locks. |
| 5. | If the shift lock solenoid does not work, replace the shift lock solenoid. |
| 6. | Check that the shift lock releases when the shift lock release is pushed, and check that it locks when the shift lock release is released. |