CANISTER > INSPECTION

for Preparation Click here



1. INSPECT CHARCOAL CANISTER


    A211259E05
  1. While holding port C closed, apply compressed air to port A and check that air flows out from port B.
    Text in Illustration 
    *a
    Air
    If the result is not as specified, replace the charcoal canister.



    A211260E05
  1. While holding port C closed, apply compressed air to port B and check that air flows out from port A.
    Text in Illustration 
    *a
    Air
    If the result is not as specified, replace the charcoal canister.



    A211261E05
  1. Apply compressed air to port B and check that air flows out from port A and port C.
    Text in Illustration 
    *a
    Air
    If the result is not as specified, replace the charcoal canister.



    A211262E04
  1. While holding ports A and C closed, apply vacuum to port B to check for leaks.
    If there are leaks, replace the charcoal canister.