BATTERY SMART UNIT > INSTALLATION
for Preparation
Click here
1. INSTALL BATTERY SMART UNIT
CAUTION:
Be sure to wear insulated gloves and protective goggles.
Install the battery smart unit with the 2 bolts.
Torque:
7.5 N*m{ 76 kgf*cm , 66 in.*lbf }
Connect the 3 connectors.
NOTICE:
The connectors should be connected securely.
2. INSTALL HYBRID BATTERY JUNCTION BLOCK ASSEMBLY
(
Click here
)