ECM > INSTALLATION

for Preparation Click here



1. INSTALL ECM
  1. Install the 2 ECM brackets to the ECM with the 4 screws.

  1. Install the ECM with the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



  1. Connect the 2 ECM connectors.



      A248588
    1. Connect the 2 ECM connectors and lower the 2 levers.

      NOTICE:
      1. When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.
      2. Make sure that the 2 levers are securely locked.

    2. Install the wire harness clamp.



2. INSTALL INVERTER RESERVE TANK ASSEMBLY
  1. Install the inverter reserve tank assembly with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



3. INSTALL INVERTER WITH CONVERTER ASSEMBLY
(Click here)


4. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL


5. INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE
  1. Engage the 4 claws and 2 guides to install the rear floor board upper No. 3 plate.



6. INSTALL DECK FLOOR BOX RH
  1. Engage the 6 guides.

  1. Install the deck floor box RH with the clip.



7. INSTALL REAR NO. 3 FLOOR BOARD
  1. Install the rear No. 3 floor board.



8. INSTALL REAR DECK FLOOR BOX
  1. Install the rear deck floor box.



9. INSTALL REAR NO. 2 FLOOR BOARD
  1. Install the rear No. 2 floor board.



10. PERFORM INITIALIZATION

NOTICE:
  1. Perform Initialization when replacing the ECM (Click here).
  2. When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).