STEERING GEAR > INSPECTION |
| 1. INSPECT TIE ROD END SUB-ASSEMBLY LH |
![]() |
Secure the tie rod end sub-assembly LH in a vise.
Install the nut to the stud bolt.
Flip the ball joint back and forth 5 times.
Set a torque wrench to the nut, turn the ball joint continuously at a rate of 2 to 4 seconds per turn, and check the turning torque on the 5th turn.
| 2. INSPECT TIE ROD END SUB-ASSEMBLY RH |
| 3. INSPECT TOTAL PRELOAD |
![]() |
Install SST to the pinion shaft and turn it left and right 5 times or more.
Set a torque wrench to SST and turn the pinion shaft continuously at a rate of 4 to 6 seconds per turn to inspect the total preload of the steering gear assembly.