FRONT BLOWER MOTOR > INSTALLATION |
| 1. INSTALL FRONT BLOWER MOTOR SUB-ASSEMBLY (w/o PTC Heater) |
Install the front blower motor sub-assembly with the 3 screws.
Engage the clamp and connect the connector.
| 2. INSTALL FRONT BLOWER MOTOR SUB-ASSEMBLY (w/ PTC Heater) |
Install the front blower motor sub-assembly with the 3 screws.
Install the quick heater connector screw.
Reattach the felt tape.
Engage the clamp and connect the connector.
| 3. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for LHD) |
Connect the connector.
Engage the clamp.
Engage the guide, claw and 2 clips to install the No. 2 instrument panel under cover sub-assembly.
| 4. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for RHD) |
Connect the connector.
Engage the clamp.
Engage the 2 guides, claw and 2 clips to install the No. 2 instrument panel under cover sub-assembly.