PARK / NEUTRAL POSITION SWITCH > INSTALLATION


  1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY

  2. INSTALL ENGINE REAR MOUNTING MEMBER

  3. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  5. ADJUST SHIFT LEVER POSITION

  6. INSPECT SHIFT LEVER POSITION

  7. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY

  8. INSTALL PROPELLER W/CENTER BEARING SHAFT ASSEMBLY

  9. INSTALL FRONT EXHAUST PIPE ASSEMBLY

  10. INSTALL ENGINE UNDER COVER AIR GUIDE BRACKET

  11. ADD AUTOMATIC TRANSMISSION FLUID

  12. INSTALL ENGINE UNDER COVER NO.2

  13. CHECK FOR EXHAUST GAS LEAKS

  14. PERFORM INITIALIZATION