FLOOR SHIFT ASSEMBLY > INSTALLATION


  1. INSTALL FLOOR SHIFT ASSEMBLY

  2. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY

  3. ADJUST SHIFT LEVER POSITION

  4. INSPECT SHIFT LEVER POSITION

  5. INSTALL FRONT FLOOR HEAT INSULATOR NO.1

  6. INSTALL EXHAUST PIPE ASSEMBLY FRONT

  7. INSTALL NO.2 CONSOLE BOX DUCT

  8. INSTALL CONSOLE BOX

  9. INSTALL CONSOLE BOX REGISTER ASSEMBLY

  10. REMOVE CONSOLE BOX PLATE

  11. INSTALL INSTRUMENT PANEL FINISH PANEL END LH

  12. INSTALL INSTRUMENT PANEL FINISH PANEL END RH

  13. INSTALL CONSOLE UPPER PANEL ASSEMBLY

  14. INSTALL FRONT CONSOLE UPPER PANEL GARNISH

  15. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  16. PERFORM INITIALIZATION