FLOOR SHIFT ASSEMBLY > REMOVAL


  1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

  2. REMOVE FRONT CONSOLE UPPER PANEL GARNISH

  3. REMOVE CONSOLE UPPER PANEL ASSEMBLY

  4. REMOVE INSTRUMENT PANEL FINISH PANEL END LH

  5. REMOVE INSTRUMENT PANEL FINISH PANEL END RH

  6. REMOVE CONSOLE BOX PLATE

  7. REMOVE CONSOLE BOX REGISTER ASSEMBLY

  8. REMOVE CONSOLE BOX

  9. REMOVE NO.2 CONSOLE BOX DUCT

  10. REMOVE ENGINE UNDER COVER NO.2

  11. REMOVE FRONT EXHAUST PIPE ASSEMBLY

  12. REMOVE FRONT FLOOR HEAT INSULATOR NO.1

  13. SEPARATE FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY

  14. REMOVE FLOOR SHIFT ASSEMBLY