INTAKE MANIFOLD > INSTALLATION


  1. INSTALL INTAKE MANIFOLD SUB-ASSEMBLY

  2. CONNECT NO. 2 FUEL PIPE SUB-ASSEMBLY

  3. CONNECT ENGINE WIRE

  4. INSTALL NO. 3 V-BANK COVER BRACKET

  5. INSTALL NO. 2 V-BANK COVER BRACKET

  6. INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for EVAP)

  7. INSTALL V-BANK COVER BRACKET

  8. INSTALL NO. 4 V-BANK COVER BRACKET

  9. INSTALL THROTTLE BODY ASSEMBLY

  10. INSTALL INTAKE AIR CONNECTOR PIPE

  11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  12. CHECK FOR FUEL LEAKS

  13. ADD ENGINE COOLANT

  14. CHECK FOR COOLANT LEAKS

  15. INSTALL V-BANK COVER SUB-ASSEMBLY

  16. INSTALL ENGINE ROOM SIDE COVER LH

  17. INSTALL ENGINE ROOM SIDE COVER RH

  18. INSTALL AIR CLEANER INLET

  19. INSTALL COOL AIR INTAKE DUCT SEAL

  20. PERFORM INITIALIZATION