ROOF DRIP SIDE FINISH MOULDING > INSTALLATION |
| Item | Temperature |
| Vehicle Body | 40 to 60°C (104 to 140°F) |
| Clip | 20 to 30°C (68 to 86°F) |
| 1. INSTALL ROOF DRIP SIDE FINISH MOULDING CLIP |

Remove the tape that remains on the moulding installation area of the vehicle body, and then clean the surface with white gasoline.
Heat the clip installation surfaces of the vehicle body and the installation part of the clips.
Install new clips in the positions shown in the illustration. Press-fit the clips by hand.
| 2. INSTALL ROOF DRIP SIDE FINISH MOULDING |
![]() |
Install the moulding to the vehicle body's 16 clips.
Remove the protective tape from the edges of the moulding.