VALVE BODY ASSEMBLY > INSTALLATION

for Preparation Click here



1. INSTALL TRANSMISSION VALVE BODY ASSEMBLY


    G031450E01
  1. Install the check ball body and spring.

    NOTICE:
    Do not drop the check ball body and spring.



    C107693E02
  1. Confirm that the accumulator pistons, check ball body and spring are installed as shown in the illustration.



    C107692E01
  1. Align the groove of the manual valve with the lever pin.



    G032354E02
  1. Install the 20 bolts.

    Torque:
    11 N*m{ 110 kgf*cm , 8 ft.*lbf }

    Bolt length:
    Bolt A:
    36 mm (1.42 in.)
    Bolt B:
    25 mm (0.98 in.)
    Bolt C:
    45 mm (1.77 in.)
    Bolt D:
    50 mm (1.97 in.)



2. CONNECT TRANSMISSION WIRE
  1. Coat an O-ring of the ATF temperature sensor with ATF.



    C101663
  1. Connect the 9 connectors to the solenoid valves.



    C101662E01
  1. Install the 2 clamps with the 2 bolts.

    Torque:
    Bolt A:
    6.4 N*m{ 65 kgf*cm , 57 in.*lbf }
    Bolt B:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



    C101517
  1. Install the ATF temperature sensor and lock plate with the bolt.

    Torque:
    10 N*m{ 100 kgf*cm , 7 ft.*lbf }



3. INSTALL VALVE BODY OIL STRAINER ASSEMBLY
  1. Coat a new O-ring with ATF.



    G028240E01
  1. Install the O-ring.



    G028239
  1. Install the oil strainer with the 4 bolts.

    Torque:
    10 N*m{ 100 kgf*cm , 7 ft.*lbf }



4. INSTALL AUTOMATIC TRANSMISSION OIL PAN SUB-ASSEMBLY


    C107690E01
  1. Install the 3 magnets in the oil pan.



    G028238
  1. Install a new gasket, install the oil pan to the transmission case with the 20 bolts.

    Torque:
    4.4 N*m{ 45 kgf*cm , 39 in.*lbf }



5. INSTALL ENGINE UNDER COVER AIR GUIDE BRACKET


    C107691
  1. Install the engine under cover air guide bracket with the 2 bolts.

    Torque:
    26 N*m{ 260 kgf*cm , 19 ft.*lbf }



6. INSTALL EXHAUST PIPE NO.1 SUPPORT BRACKET SUB-ASSEMBLY


    A100616
  1. Install the exhaust pipe No.1 support bracket sub-assembly with the 2 bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }



7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


8. ADD AUTOMATIC TRANSMISSION FLUID
(Click here)


9. INSTALL ENGINE UNDER COVER NO.2


10. RESET MEMORY
(Click here)


11. PERFORM INITIALIZATION
(Click here)