ECM > INSTALLATION |
| 1. INSTALL ECM |
![]() |
Install the ECM to the ECM box.
![]() |
Install the ECM to the ECM box with the 2 nuts.
Connect the ECM connectors.
Connect the 6 ECM connectors.
![]() |
Connect the No. 4 connector holder to the ECM box.
| 2. INSTALL ECM COVER |
![]() |
Install the ECM cover with the 3 bolts.
| 3. INSTALL ENGINE ROOM SIDE COVER LH |
![]() |
Install the side cover with the 3 clips.
| 4. INSTALL COOL AIR INTAKE DUCT SEAL |
![]() |
Install the intake duct seal with the 7 clips.
| 5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 6. PERFORM INITIALIZATION |
Perform initialization (Click here).