FUEL INJECTOR > INSTALLATION |
| 1. INSTALL INJECTOR |
![]() |
Install new insulators to each fuel injector.
Apply a light coat of grease or gasoline to a new O-ring and install it to the injector.
![]() |
Apply a light coat of grease or gasoline where the delivery pipe contacts the O-ring.
To install the fuel injector into the fuel delivery pipe, push the fuel injector while turning it right and left.
Position the injector connector outward.
| 2. INSTALL FUEL DELIVERY PIPE |
![]() |
Place the fuel delivery pipe and the 6 fuel injectors together to the intake manifold.
Temporarily install the 6 bolts which are used to hold the fuel delivery pipe to the intake manifold.
Check that the fuel injectors rotate smoothly.
![]() |
Position the fuel injector connector outward.
Tighten the 5 bolts which are used to hold the fuel delivery pipe to the intake manifold.
Connect the No. 1 fuel hose to the cylinder head cover with the bolt.
Connect the 6 fuel injector connectors.
| 3. CONNECT FUEL MAIN TUBE |
![]() |
Connect the connector to the fuel main pipe. Push the two parts together firmly until a "click" sound is heard. Then attach the lock claws to the connector by pushing down on the connector cover.
![]() |
Check that the connector and fuel main pipe are securely connected by trying to pull them apart.
![]() |
Install the fuel pipe clamp.
| 4. INSTALL INTAKE AIR SURGE TANK |
![]() |
Install a new gasket to the intake air surge tank.
Install the intake air surge tank with the 2 nuts.
Using a 5 mm hexagon socket wrench, install the 4 bolts.
![]() |
Install the 2 surge tank stays with the 4 bolts.
For Chinese specification:
Connect the water hose joint with the bolt.
For except Chinese specification:
Connect the water by-pass pipe with the bolt.
Install the 3 wire harness clamps.
Connect the IACV connector.
Connect the throttle motor connector.
| 5. CONNECT VENTILATION HOSE |
![]() |
Connect the ventilation hose to the ventilation valve.
| 6. CONNECT UNION TO CHECK VALVE HOSE |
Connect the hose to the surge tank.
| 7. CONNECT WATER BY-PASS HOSE |
![]() |
Connect the 2 water by-pass hoses to the throttle body.
| 8. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE |
![]() |
Install the air cleaner cap with air cleaner hose with the 4 clamps and hose clamp.
![]() |
Install the VSV (for EVAP) to the air cleaner hose.
![]() |
Connect the MAF meter connector and clamp to the air cleaner.
| 9. CONNECT NO. 2 VENTILATION HOSE |
![]() |
Connect the ventilation hose to the cylinder head cover with the clamp.
| 10. ADD ENGINE COOLANT |
Tighten all the plugs and fill the radiator with TOYOTA Super Long Life Coolant (SLLC).
Add engine coolant.
Slowly pour coolant into the radiator reservoir until it reaches the FULL line.
Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
If the coolant level is low, add coolant.
Install the radiator cap and reservoir cap.
Bleed air from the cooling system.
Warm up the engine until the thermostat opens. While the thermostat is open, circulate the coolant for several minutes.
Maintain the engine speed at 2,000 to 2,500 rpm.
Press the inlet and outlet radiator hoses several times by hand to bleed air.
Stop the engine, and wait until the engine coolant cools down to ambient temperature.
![]() |
Check the coolant level in the radiator reservoir.
If the coolant level is low, add SLLC to the radiator reservoir FULL line.
| 11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 12. CHECK FOR COOLANT LEAKAGE |
![]() |
Fill the radiator with coolant and attach a radiator cap tester.
Warm up the engine.
Using a radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm, 17 psi), and check that the pressure does not drop.
If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.
| 13. CHECK FOR FUEL LEAKAGE |
Start the engine, and check that there are no fuel leaks after performing maintenance anywhere on the system.
| 14. CHECK FOR ENGINE OIL LEAKAGE |
Start the engine, and check that there are no oil leaks after performing maintenance.
| 15. INSTALL V-BANK COVER |
![]() |
Install the V-bank cover with the 2 nuts.
| 16. INSTALL ENGINE ROOM SIDE COVER RH |
![]() |
Install the side cover with the 2 clips and nut.
| 17. INSTALL COOL AIR INTAKE DUCT SEAL |
![]() |
Install the intake duct seal with the 7 clips.
| 18. INSTALL ENGINE UNDER COVER |
![]() |
Install the under cover with the 10 bolts and 3 clips.
| 19. PERFORM INITIALIZATION |
Perform initialization (Click here).
| 20. WARM UP ENGINE |
After the engine is warmed up, check that the maintained parts operate normally.