STEERING GEAR > INSTALLATION |
| 1. INSTALL POWER STEERING LINK ASSEMBLY |
![]() |
Install the power steering link assembly with the 2 bolts, 2 wasters and 2 nuts.
![]() |
Install the power steering earth wire to the power steering link assembly with bolt (B).
Connect wire harness connector (E) to the power steering link assembly and securely lock the connector.
Connect 2 wire harness connectors (C) and (D) to the power steering link assembly.
Install the 2 wire harness clamps to the power steering link assembly.
Connect the earth wire to the bracket with bolt (A).
| 2. CONNECT TIE ROD END LH |
Connect the tie rod end LH to the steering knuckle with the nut.
Install a new clip.
| 3. CONNECT TIE ROD END RH |
| 4. CONNECT STEERING INTERMEDIATE SHAFT ASSEMBLY NO.2 |
![]() |
Align the matchmarks on the intermediate shaft assembly No.2 and the power steering link assembly.
![]() |
Install bolt (A) and tighten the 2 bolts.
| 5. INSTALL FRONT SUSPENSION MEMBER PROTECTOR LOWER |
![]() |
Install the front suspension member protector lower to the front suspension cross member with the 4 bolts.
| 6. INSTALL ENGINE UNDER COVER NO.2 |
| 7. INSTALL ENGINE UNDER COVER |
| 8. INSTALL FRONT WHEELS |
| 9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 10. PLACE FRONT WHEELS FACING STRAIGHT AHEAD |
| 11. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT |
| 12. PERFORM INITIALIZATION |
| 13. INITIALIZE ROTATION ANGLE SENSOR VALUE AND CALIBRATE TORQUE SENSOR ZERO POINT |
| 14. PERFORM VARIABLE GEAR RATIO STEERING SYSTEM CALIBRATION (for 3UZ-FE) |