COMBINATION METER > INSTALLATION

for Preparation Click here



1. INSTALL COMBINATION METER GLASS


B113501E02
  1. Attach the 7 claws to install the glass.



    B113918
  1. Install the glass's wire harness with the clamps.



    B113499
  1. Connect the 3 connectors.



    B113986E01
  1. Close the cover and attach the 2 claws



2. INSTALL COMBINATION METER ASSEMBLY


B105641
  1. Connect the connector.

  1. Install the combination meter with the 4 screws.



3. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY


B105640E07
  1. Connect the connector.

  1. Attach the 5 clips to install the cluster finish panel.



4. INSTALL STEERING COLUMN COVER UPPER
For 3GR-FE (Click here)
For 3GR-FSE (Click here)
For 3UZ-FE (Click here)


5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


6. PERFORM INITIALIZATION

NOTICE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.

  1. Perform initialization (Click here).



7. CHECK SRS WARNING LIGHT
  1. Check the SRS warning light (Click here).