WATER PUMP > INSTALLATION |
| 1. INSTALL WATER PUMP ASSEMBLY |
![]() |
Install a new gasket and the water pump with the 16 bolts.
| 2. INSTALL TENSIONER PULLEY |
![]() |
Install the tensioner pulley and cover plate with the bolt (marking: L).
| 3. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY |
![]() |
Install the pulley and cover plate with the bolt.
| 4. INSTALL WATER INLET ASSEMBLY |
![]() |
Install a new gasket to the water inlet housing.
Install a new O-ring to the water outlet pipe.
![]() |
Install the water inlet with the 4 bolts and nut.
![]() |
Connect the 5 hoses.
![]() |
Connect the 2 radiator hoses.
| 5. ADD ENGINE COOLANT |
Tighten all the plugs and fill the radiator with TOYOTA Super Long Life Coolant (SLLC).
Add engine coolant.
Slowly pour coolant into the radiator reservoir until it reaches the FULL line.
Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
If the coolant level is low, add coolant.
Install the radiator cap and reservoir cap.
Bleed air from the cooling system.
Warm up the engine until the thermostat opens. While the thermostat is open, circulate the coolant for several minutes.
Maintain the engine speed at 2,000 to 2,500 rpm.
Press the inlet and outlet radiator hoses several times by hand to bleed air.
Stop the engine, and wait until the engine coolant cools down to ambient temperature.
![]() |
Check the coolant level in the radiator reservoir.
If the coolant level is low, add SLLC to the radiator reservoir FULL line.
| 6. CHECK FOR ENGINE COOLANT LEAKS |
Check for engine coolant leaks (Click here).
| 7. INSTALL WATER PUMP PULLEY |
![]() |
Temporarily install the pulley with the 4 bolts.
Using SST, hold the pulley and tighten the 4 bolts.
| 8. INSTALL NO. 2 ENGINE COVER |
![]() |
Install the cover with the 3 nuts.
| 9. INSTALL V-RIBBED BELT |
![]() |
Install the V-ribbed belt.
While turning the belt tensioner counterclockwise, remove the bar.
![]() |
If it is difficult to install the V-ribbed belt, perform the following procedure.
Put the V-ribbed belt on everything except the tensioner pulley as shown in the illustration.
While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the tensioner pulley.
| 10. INSTALL V-BANK COVER SUB-ASSEMBLY |
Install the cover with the 2 nuts.
| 11. INSTALL NO. 1 AIR CLEANER INLET |
Install the inlet with the bolt.
| 12. INSTALL COOL AIR INTAKE DUCT SEAL |
![]() |
Install the duct seal with the 7 clips.
| 13. INSTALL ENGINE UNDER COVER |
![]() |
Install the under cover with the 3 clips and 10 screws.
| 14. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 15. PERFORM INITIALIZATION |
Perform initialization (Click here).