GENERATOR > INSTALLATION

for Preparation Click here



1. INSTALL GENERATOR ASSEMBLY


A106487E02
  1. Install the generator with the bolt and 2 nuts.

    HINT:
    Install the bolt and 2 nuts in alphabetical order.

    Torque:
    39 N*m{ 398 kgf*cm , 29 ft.*lbf } for bolt A and nut B
    15.5 N*m{ 158 kgf*cm , 11 ft.*lbf } for nut C

  1. Install the ground cable with the bolt D.



    A106485
  1. Install the battery cable with the nut, and then attach the rubber cap.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

  1. Install the bracket with the bolt.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }

  1. Connect the cable to the generator.



2. INSTALL V-RIBBED BELT


    A107652E02
  1. Set the V-belt to everything except the No. 2 idler pulley, as shown in the illustration.

  1. Loosen the V-belt by turning the belt tensioner counterclockwise.

  1. Then set the V-belt to the idler pulley.



    A052038
  1. After a new belt has been installed, check that the mark is within the A range shown in the illustration.



3. INSTALL AIR CLEANER ASSEMBLY WITH INTAKE AIR CONNECTOR PIPE
  1. Install the air cleaner assembly with the 3 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }



    A107650
  1. Connect the MAF meter connector and clamp to the air cleaner.



4. INSTALL AIR CLEANER INLET
  1. Install the inlet with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }



5. INSTALL ENGINE ROOM COVER SIDE RH


    A110866E01
  1. Install the side cover with the 2 clips and nut.



6. INSTALL COOL AIR INTAKE DUCT SEAL


B106147
  1. Install the duct seal with the 7 clips.



7. INSTALL ENGINE UNDER COVER


B107493
  1. Install the under cover with the 3 clips and 10 screws.



8. INSTALL V-BANK COVER SUB-ASSEMBLY
  1. Install the cover with the 2 nuts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }



9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


10. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.