3UZ-FE COMPRESSOR AND PULLEY > INSTALLATION |
| 1. ADJUST COMPRESSOR OIL |
When replacing the compressor and magnetic clutch with a new one, after gradually discharging the refrigerant gas from the service valve, drain the following volume of oil from the new compressor and magnetic clutch before installation.
| 2. INSTALL COMPRESSOR ASSEMBLY |
![]() |
Hang the compressor bracket onto the fan bracket and temporarily install the compressor with the bolt.
![]() |
Install the compressor with the 3 bolts, nut and bracket.
| 3. INSTALL OIL FILTER |
Install the oil filter.
| 4. INSTALL DISCHARGE HOSE SUB-ASSEMBLY (w/ Plug Thermostat) |
![]() |
Remove the vinyl tape attached to the hose.
Apply sufficient compressor oil (ND-OIL 8) to a new O-ring and the fitting surface of the compressor.
Install the O-ring on the discharge hose.
Install the discharge hose on the compressor with the bolt.
| 5. INSTALL NO. 1 COOLER REFRIGERANT SUCTION HOSE |
![]() |
Remove the vinyl tape attached to the hose.
Apply sufficient compressor oil (ND-OIL 8) to a new O-ring and the fitting surface of the compressor.
Install the O-ring on the suction hose.
Install the suction hose on the compressor with the bolt.
| 6. INSTALL ENGINE UNDER COVER |
![]() |
Install the under cover with the 3 clips and 10 screws.
| 7. INSTALL V-RIBBED BELT |
![]() |
Set the V-belt to everything except the No. 2 idler pulley, as shown in the illustration.
Loosen the V-belt by turning the belt tensioner counterclockwise.
Then set the V-belt to the idler pulley.
![]() |
After a new belt has been installed, check that the mark is within the A range shown in the illustration.
| 8. INSTALL V-BANK COVER SUB-ASSEMBLY |
Install the V-bank cover with the 2 nuts.
| 9. INSTALL NO. 1 AIR CLEANER INLET |
Install the air cleaner inlet and bolt.
| 10. INSTALL ENGINE ROOM SIDE COVER LH |
![]() |
Install the side cover with the 3 clips.
| 11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 12. CHARGE REFRIGERANT |
Perform vacuum purging using a vacuum pump.
Charge refrigerant HFC-134a (R134a).

| 13. INSTALL COOL AIR INTAKE DUCT SEAL |
![]() |
Install the intake duct seal with the 7 clips.
| 14. WARM UP ENGINE |
Warm up the engine at less than 1,850 rpm for 2 minutes or more after charging the refrigerant.
| 15. CHECK FOR LEAKAGE OF REFRIGERANT |
After recharging the refrigerant gas, check for refrigerant gas leakage using a halogen leak detector.
Perform the operation under these conditions:
![]() |
Using a gas leak detector, check the refrigerant line for leakage.
If a gas leak is not detected on the drain hose, remove the blower motor control (blower resistor) from the cooling unit. Insert the gas leak detector sensor into the unit and perform the test.
Disconnect the connector and leave the pressure switch on for approximately 20 minutes. Bring the gas leak detector close to the pressure switch and perform the test.
| 16. PERFORM INITIALIZATION |
Perform initialization (Click here).