3GR-FSE COMPRESSOR AND PULLEY > INSTALLATION |
| 1. ADJUST COMPRESSOR OIL |
When replacing the compressor with a new one, after gradually discharging the refrigerant gas from the service valve, drain the following volume of oil from the new compressor before installation.
| 2. INSTALL COMPRESSOR ASSEMBLY |
![]() |
Using an E8 "torx" socket, install the compressor with the stud bolt.
![]() |
Install the compressor with the 3 bolts and nut.
| 3. INSTALL DISCHARGE HOSE SUB-ASSEMBLY |
![]() |
Remove the attached vinyl tape from the discharge hose.
Apply sufficient compressor oil (ND-OIL 8) to a new O-ring and the fitting surface of the compressor.
Install the O-ring on the discharge hose.
Install the discharge hose on the compressor with the bolt.
| 4. INSTALL NO. 1 COOLER REFRIGERANT SUCTION HOSE |
![]() |
Remove the attached vinyl tape from the suction hose.
Apply sufficient compressor oil (ND-OIL 8) to a new O-ring and the fitting surface of the compressor.
Install the O-ring on the suction hose.
Install the suction hose on the compressor with the bolt.
| 5. INSTALL ENGINE UNDER COVER |
![]() |
Install the under cover with the 3 clips and 10 screws.
| 6. INSTALL V-RIBBED BELT |
![]() |
Install the V-ribbed belt.
While turning the belt tensioner counterclockwise, remove the bar.
![]() |
If it is difficult to install the V-ribbed belt, perform the following procedure.
Put the V-ribbed belt on everything except the tensioner pulley as shown in the illustration.
While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the tensioner pulley.
| 7. INSTALL NO. 1 AIR CLEANER INLET |
![]() |
Install the air cleaner inlet with the bolt.
| 8. INSTALL ENGINE ROOM LH SIDE COVER |
![]() |
Install the side cover with the 3 clips.
| 9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 10. CHARGE REFRIGERANT |
Perform vacuum purging using a vacuum pump.
Charge refrigerant HFC-134a (R134a).

| 11. INSTALL COOL AIR INTAKE DUCT SEAL |
![]() |
Install the intake duct seal with the 7 clips.
| 12. WARM UP ENGINE |
Warm up the engine at less than 1,850 rpm for 2 minutes or more after charging the refrigerant.
| 13. CHECK FOR LEAKAGE OF REFRIGERANT |
After recharging the refrigerant gas, check for refrigerant gas leakage using a halogen leak detector.
Perform the operation under these conditions:
![]() |
Using a gas leak detector, check the refrigerant line for leakage.
If a gas leak is not detected on the drain hose, remove the blower motor control (blower resistor) from the cooling unit. Insert the gas leak detector sensor into the unit and perform the test.
Disconnect the connector and leave the pressure switch on for approximately 20 minutes. Bring the gas leak detector close to the pressure switch and perform the test.
| 14. PERFORM INITIALIZATION |
Perform initialization (Click here).