INTEGRATION RELAY > INSTALLATION |
| 1. INSTALL INTEGRATION RELAY |
Connect the 3 connectors.
Attach the integration relay to the engine room No. 2 junction block.
Install the engine room No. 2 relay block cover.
| 2. REMOVE ENGINE ROOM SIDE COVER LH |
![]() |
Install the side cover with the 3 clips.
| 3. REMOVE COOL AIR INTAKE DUCT SEAL |
![]() |
Install the intake duct seal with the 7 clips.
| 4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 5. PERFORM INITIALIZATION |
Perform initialization (Click here).