SFI SYSTEM > ECM Power Source Circuit

for Preparation Click here


DESCRIPTION

When the engine switch is turned to on, the battery voltage is applied to terminal IGSW of the ECM. The ECM MREL output signal causes a current to flow to the coil, closing the contacts of the EFI MAIN relay and supplying power to terminal +B of the ECM.
If the engine switch is turned to off, the ECM holds the EFI MAIN relay ON for a maximum of 2 seconds to allow for the initial setting of the throttle valve.
When the engine switch is turned on (IG), voltage from the ECM's MREL terminal flows to the integration relay (EFI MAIN relay). This causes the contacts of the integration relay (EFI MAIN relay) to close, which supplies power to terminal +B or +B1 of the ECM.

WIRING DIAGRAM


A103824E05


A103825E05


INSPECTION PROCEDURE

1.INSPECT ECM (+B, +B1 VOLTAGE)
A103828E33
  1. Turn the engine switch on (IG).

  1. Measure the voltage between the terminals of the A6 and E7 ECM connectors.

    Standard voltage:
    Tester Connection
    Specified Condition
    +B (A6-6) - E1 (E7-7)
    9 to 14 V
    +B1 (A6-5) - E1 (E7-7)
    9 to 14 V



OK
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN ON PROBLEM SYMPTOMS TABLE
NG


2.CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
A107151E04
  1. Disconnect the E7 ECM connector.

  1. Measure the resistance.

    Standard resistance (Check for open):
    Tester Connection
    Specified Condition
    E1 (E7-7) - Body ground
    Below 1 Ω

  1. Reconnect the ECM connector.



NG
REPAIR OR REPLACE HARNESS AND CONNECTOR
OK


3.INSPECT ECM (IGSW VOLTAGE)
A103828E34
  1. Turn the engine switch on (IG).

  1. Measure the voltage between the terminals of the A6 and E7 ECM connectors.

    Standard voltage:
    Tester Connection
    Specified Condition
    IGSW (A6-17) - E1 (E7-7)
    9 to 14 V



OK
Go to step 6
NG


4.CHECK FUSE (IGN FUSE)
A107156E03
  1. Remove the IGN fuse from the cowl side junction block RH.

  1. Measure the resistance of the IGN fuse.

    Standard resistance:
    Below 1 Ω

  1. Reinstall the IGN fuse.



NG
CHECK FOR SHORT IN ALL HARNESSES AND COMPONENTS CONNECTED TO FUSE
OK


5.INSPECT IG2 RELAY
B016200E03
  1. Remove the IG2 relay from the engine room No. 2 relay block.

  1. Measure the resistance of the IG2 relay.

    Standard resistance:
    Tester Connection
    Specified Condition
    3 - 5
    10 kΩ or higher
    3 - 5
    Below 1 Ω
    (when battery voltage applied to terminals 1 and 2)



NG
REPLACE IG2 RELAY
OK

PUSH BUTTON START SYSTEM 

6.INSPECT ECM (MREL VOLTAGE)
A103828E35
  1. Turn the engine switch on (IG).

  1. Measure the voltage between the terminals of the A6 and E7 ECM connectors.

    Standard voltage:
    Tester Connection
    Specified Condition
    MREL (A6-17) - E1 (7-7)
    9 to 14 V



NG
REPLACE ECM
OK


7.CHECK FUSE (EFI FUSE)
A107169E05
  1. Remove the EFI fuse from the engine room No. 2 junction block.

  1. Measure the resistance of the EFI fuse.

    Standard resistance:
    Below 1 Ω

  1. Reinstall the EFI fuse.



NG
CHECK FOR SHORT IN ALL HARNESSES AND COMPONENTS CONNECTED TO FUSE
OK


8.INSPECT INTEGRATION RELAY (EFI MAIN RELAY)
A107714E02
  1. Remove the integration relay from the engine room No. 2 junction block.

  1. Measure the resistance of the EFI MAIN relay.

    Standard resistance:
    Tester Connection
    Specified Condition
    2C-1 - 2A-8
    10 kΩ or higher
    2C-1 - 2A-8
    Below 1 Ω
    (when battery voltage applied to terminals 2A-6 and 2A-7)



NG
REPLACE INTEGRATION RELAY
OK


9.CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY- ECM, INTEGRATION RELAY - BODY GROUND)
A109879E01
  1. Check the harness and the connectors between the integration relay and the ECM.

    1. Remove the integration relay from the engine room No. 2 relay block, junction block.

    2. Disconnect the A6 ECM connector.

    3. Measure the resistance of the wire harness side connectors.

      Standard resistance (Check for open):
      Tester Connection
      Specified Condition
      2A-6 - MREL (A6-13)
      Below 1 Ω

      Standard resistance (Check for short):
      Tester Connection
      Specified Condition
      2A-6 or MREL (A6-13) - Body ground
      10 kΩ or higher

  1. Check the harness and the connectors between the integration relay and body ground.

    1. Remove the integration relay from the engine room No. 2 relay block, junction block.

    2. Measure the resistance of the wire harness side connector and body ground.
      Standard resistance (Check for open): 
      Tester Connection
      Specified condition
      2A-7 - Body ground
      Below 1 Ω



NG
REPAIR OR REPLACE HARNESS AND CONNECTOR
OK

CHECK AND REPAIR HARNESS AND CONNECTOR (TERMINAL +B OF ECM - BATTERY POSITIVE TERMINAL)