SFI SYSTEM > Cranking Holding Function Circuit

for Preparation Click here


DESCRIPTION

The cranking holding control system provides current to the starter when the ECM detects the engine switch's start signal (STSW). When the ECM performs a firing judgment, the system cuts current to the starter. When an ECM receives the STSW signal, it turns on the ST CUT relay, which prevents flickering of the combination meter, clock, audio system, etc. Also, the ECM sends a signal to the ECM's STAR terminal. Then the STAR output signal travels through the park/neutral position (PNP) switch to the STARTER relay, causing the starter to activate.
When the engine is cranking, the starter operation signal is sent to the ECM's STA terminal.

A103821E07


WIRING DIAGRAM

Refer to DTC P0617 on page Click here.

INSPECTION PROCEDURE

1.CHECK OPERATION OF ENGINE CRANKING
  1. When turning the engine switch to the START position, check whether the starter motor starts.



OK
CHECK FOR INTERMITTENT PROBLEMS
NG


2.READ VALUE OF INTELLIGENT TESTER (STARTER SIGNAL)
  1. Connect the intelligent tester to the DLC3.

  1. Turn the engine switch on (IG) and turn the tester ON.

  1. Enter the following menus: Powertarin / Engine / Data List / Starter Signal.

  1. Check the result when the engine switch is turned to on (IG) and START.

    Standard 
    Engine Switch Position
    ON (IG)
    START
    Starter Signal
    OFF
    ON



OK
Go to step 6
NG


3.INSPECT ECM (STAR AND STSW VOLTAGE)
A103828E62
  1. Measure the voltage between the terminals of the A6 and E7 ECM connectors while cranking the engine.

    Standard voltage:
    Tester Connection
    Specified Condition
    STAR (E7-4) - E1 (E7-7)
    9 to 14 V
    STSW (A6-19) - E1 (E7-7)
    9 to 14 V


    Result: 
    Terminal STAR
    Terminal STSW
    Proceed to
    9 to 14 V
    9 to 14 V
    A
    0 V
    9 to 14 V
    B
    0 V
    0 V
    C



B
REPLACE ECM

C
Go to step 10
A


4.INSPECT ST CUT RELAY
B016200
  1. Remove the ST CUT relay from the engine room No. 2 relay block

  1. Measure the resistance of the ST CUT relay.

    Standard resistance:
    Tester Connection
    Specified Condition
    3 - 5
    10 kΩ or higher
    3 - 5
    Below 1 Ω
    (When battery voltage applied to terminals 1 and 2)



NG
REPLACE ST CUT RELAY
OK


5.INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
A079133E02
  1. Disconnect the E25 park/neutral position (PNP) switch connector.

  1. Measure the resistance between each terminal shown below when the shift lever is moved to each range.

    Standard resistance:
    Shift Position
    Tester Connection
    Specified Condition
    P
    6 - 9
    Below 1 Ω
    N
    6 - 9
    Below 1 Ω



NG
REPLACE PARK/NEUTRAL POSITION SWITCH
OK

CHECK AND REPAIR HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - ECM, ECM - ST CUT RELAY, ST CUT RELAY, ST CUT - PARK/NEUTRAL POSITION SWITCH) 

6.INSPECT STARTER RELAY
B016200E02
  1. Remove the starter relay from the engine room No. 1 relay block.

  1. Measure the resistance of the starter relay.

    Standard resistance:
    Tester Connection
    Specified Condition
    3 - 5
    10 kΩ or higher
    3 - 5
    Below 1 Ω
    (When battery voltage applied to terminals 1 and 2)



NG
REPLACE STARTER RELAY
OK


7.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - STARTER RELAY)
A110116E03
  1. Check the harness and the connectors between the park/neutral position switch and the starter relay.

    1. Disconnect the E25 PNP switch connector.

    2. Remove the starter relay from the engine room No. 1 relay block

    3. Measure the resistance between the wire harness side connectors.

      Standard resistance (Check for open):
      Tester Connection
      Specified Condition
      Park/Neutral position switch (E25-6) - Starter relay terminal (1)
      Below 1 Ω

      Standard resistance (Check for short):
      Tester Connection
      Specified Condition
      Park/Neutral position switch (E25-6) or Starter relay terminal (1) - Body ground
      10 kΩ or higher

  1. Check the harness and the connector between the starter relay and the body ground.

    1. Remove the starter relay from the engine room No. 1 relay block.

    2. Measure the resistance between the starter relay and the body ground.

      Standard resistance (Check for open):
      Tester Connection
      Specified Condition
      Starter relay terminal (2) - Body ground
      Below 1 Ω



NG
REPAIR OR REPLACE HARNESS AND CONNECTOR
OK


8.INSPECT ENGINE ROOM RELAY BLOCK (STARTER RELAY VOLTAGE)
A110578E02
  1. Remove the starter relay from the engine room No. 1 relay block.

  1. Measure the voltage between the terminals of the engine room No. 1 relay block and the body ground.

    Standard voltage:
    Tester Connection
    Specified Condition
    Starter relay terminal (5) - Body ground
    9 to 14 V



NG
REPAIR OR REPLACE HARNESS AND CONNECTOR
OK


9.INSPECT STARTER ASSEMBLY


NG
REPAIR OR REPLACE STARTER ASSEMBLY
OK

REPAIR OR REPLACE HARNESS AND CONNECTOR (STARTER RELAY - STARTER, STARTER - BATTERY) 

10.CHECK HARNESS AND CONNECTOR (POWER SOURCE CONTROL ECU - ECM)
A107718E04
  1. Check the harness and the connectors between the power source control ECU and ECM.

    1. Disconnect the L73 power source control ECU connector.

    2. Disconnect the A6 ECM connector.

    3. Measure the resistance between the wire harness side connectors.

      Standard resistance (Check for open):
      Tester Connection
      Specified Condition
      STSW (L73-39) - STSW (A6-19)
      Below 1 Ω

      Standard resistance (Check for short):
      Tester Connection
      Specified Condition
      STSW (L73-39) or STSW (A6-19) - Body ground
      10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS AND CONNECTOR
OK

GO TO PUSH BUTTON START SYSTEM