VVT SENSOR > INSTALLATION

for Preparation Click here



1. INSTALL VVT SENSOR (for Exhaust Side of Bank 2)


    A106632
  1. Install the sensor with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the sensor connector.



2. INSTALL VVT SENSOR (for Intake Side of Bank 2)


    A106631
  1. Install the sensor with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the sensor connector.



3. INSTALL VVT SENSOR (for Exhaust Side of Bank 1)


    A106633
  1. Install the sensor with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the sensor connector.



4. INSTALL VVT SENSOR (for Intake Side of Bank 1)


    A106636
  1. Install the sensor with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the sensor connector.



5. INSTALL V-BANK COVER


A103946
  1. Install the V-bank cover with the 2 nuts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }



6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


7. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.