REAR NO. 2 UPPER CONTROL ARM > INSPECTION |
| 1. INSPECT REAR NO. 2 UPPER CONTROL ARM |
![]() |
Temporarily install the nut, and flip the ball joint stud back and forth 5 times as shown in the illustration.
Use a torque wrench to turn the nut continuously at a rate of 3 to 5 seconds per turn. Take the torque reading on the 5th turn.
Check the dust boot for cracks or grease leakage.