INSPECTION
Inspection
| INSPECT CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY |
Measure the resistance between the terminals.

- Standard resistance:
- 6.9 to 7.9 Ω at 20°C (68°F)
Connect the battery's positive (+) lead to terminal 1 and negative (-) lead to terminal 2, and check the movement of the valve.

- OK:
Condition
Specified Condition
Battery positive (+) voltage is applied
Valve moves in left arrow direction shown in illustration
Battery positive (+) voltage is cut off
Valve moves in right arrow direction shown in illustration
- NOTICE:
- If the valve cannot return properly because of foreign matter, a small pressure leak in the advanced direction may occur and a DTC may be output.
