ECM > УСТАНОВКА

для подготовки Нажмите здесь



1. INSTALL ECM


A149901
  1. Install the ECM with the 2 nuts.

    Момент затяжки: 
    5.5 Н*м{ 56 кгс*см , 49 фунт-сила-дюймов }

  1. Connect the 6 ECM connectors.



2. INSTALL TCM


A149900
  1. Install the TCM with the 2 nuts.

    Момент затяжки: 
    5.5 Н*м{ 56 кгс*см , 49 фунт-сила-дюймов }

  1. Connect the 4 TCM connectors.



3. INSTALL ENGINE ROOM ECU COVER


A149899
  1. Install the engine room ECU cover with the 3 bolts.

    Момент затяжки: 
    7.8 Н*м{ 80 кгс*см , 69 фунт-сила-дюймов }



4. INSTALL ENGINE ROOM SIDE COVER LH


    A149481
  1. Install the side cover with the 4 clips.



5. INSTALL AIR CLEANER INLET COVER


A148821E01
  1. Attach the 4 clips B.

    ПРИМЕЧАНИЕ:
    1. Make sure the clips are attached securely.
    2. Attaching the clips forcefully or hitting the top of the clips may damage them.

  1. Install the air cleaner inlet cover with the 5 clips A.



6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


7. INSTALL COWL TOP VENTILATOR LOUVER RH


E139771
  1. Install the 6 clips and cowl top ventilator louver RH.

    ПРИМЕЧАНИЕ:
    If the cowl top ventilator louver RH is not properly installed, water may leak into the engine room and cause malfunctions. Therefore, make sure the cowl top ventilator louver RH is installed properly.



8. PERFORM RESET MEMORY

ПРИМЕЧАНИЕ:
Perform the RESET MEMORY (AT initialization) when replacing the automatic transmission assembly, engine assembly or ECM (see page Нажмите здесь).

УКАЗАНИЕ:
Initialization cannot be completed by only removing the battery.



9. PERFORM INITIALIZATION
  1. Perform initialization (see page Нажмите здесь).

    ПРИМЕЧАНИЕ:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.