|
2. CONNECT TRANSMISSION WIRE
(a) Connect the 7 connectors to the solenoid valves.
(b) Install the clamp with the 2 bolts.
Torque:
10 N·m {100 kgf·cm, 7ft·lbf} for bolt A
11 N·m {110 kgf·cm, 8ft·lbf} for bolt B
HINT:
Each bolt length is indicated below.
Standard bolt length:
36 mm (1.42 in.) for bolt A
12 mm (0.47 in.) for bolt B
(c) Connect the ATF temperature sensor.
|