Last Modified: 4-30-2014 6.6 A Doc ID: RM0000017S3002X
Model Year: 2006 Model: LX470 Prod Date Range: [05/2005 -           ]
Title: 2UZ-FE EMISSION CONTROL: CANISTER: INSTALLATION; 2006 MY LX470 [05/2005 -        ]

INSTALLATION

1. INSTALL CANISTER ASSEMBLY

(a) Install the canister with the 3 bolts.

Torque:

14.7 N·m {150 kgf·cm, 11ft·lbf}

(b) Connect the 2 tubes and hose.

(1) Connect the air inlet line tube to the canister (leak detection pump).

(2) Connect the vent line tube to the canister filter.

(3) Connect the purge line hose.

HINT:

Install the hose to the canister, and then attach the retainer.

(c) Connect the connector.

(d) Secure the wire with the clamp.

2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

3. PERFORM INITIALIZATION

(a) Perform initialization 2006 MY LX470 [05/2005 -        ]; INTRODUCTION: REPAIR INSTRUCTION: INITIALIZATION .

NOTICE:

Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.