|
Last Modified: 4-30-2014 |
6.6 A |
Doc ID: RM0000017S3002X |
|
Model Year: 2006 |
Model: LX470 |
Prod Date Range: [05/2005 -
] |
|
Title:
2UZ-FE EMISSION CONTROL: CANISTER: INSTALLATION; 2006 MY LX470 [05/2005 - ]
|
INSTALLATION
1. INSTALL CANISTER ASSEMBLY
|
(a) Install the canister with the 3 bolts.
Torque:
14.7 N·m {150 kgf·cm, 11ft·lbf}
|
|
(b) Connect the 2 tubes and hose.
|
(1) Connect the air inlet line tube to the canister (leak detection pump).
|
|
(2) Connect the vent line tube to the canister filter.
(3) Connect the purge line hose.
HINT:
Install the hose to the canister, and then attach the retainer.
|
(c) Connect the connector.
|
|
(d) Secure the wire with the clamp.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
3. PERFORM INITIALIZATION
(a)
Perform initialization
.
NOTICE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
|