Last Modified: 4-30-2014 6.6 A Doc ID: RM0000017S7002X
Model Year: 2006 Model: LX470 Prod Date Range: [05/2005 -           ]
Title: 2UZ-FE EMISSION CONTROL: VACUUM SWITCHING VALVE: INSTALLATION; 2006 MY LX470 [05/2005 -        ]

INSTALLATION

1. INSTALL PURGE VSV

(a) Install the purge VSV with the bolt.

(b) Connect the 2 hoses.

(c) Connect the purge VSV connector.

2. INSTALL V-BANK COVER SUB-ASSEMBLY 2006 MY LX470 [05/2005 -        ]; 2UZ-FE ENGINE CONTROL SYSTEM: CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY: INSTALLATION+

3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

4. PERFORM INITIALIZATION

(a) Perform initialization 2006 MY LX470 [05/2005 -        ]; INTRODUCTION: REPAIR INSTRUCTION: INITIALIZATION .

NOTICE:

Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.