|
1. INSPECT PARK/NEUTRAL POSITION SWITCH
(a) Disconnect the PNP switch connector.
(b) Measure the resistance of the PNP switch when the shift lever is moved to each position.
Standard resistance:
|
Tester Connection
|
Shift Lever Position
|
Specified Condition
|
|
4 (B) - 5 (L)
|
P or N
|
Below 1 Ω
|
|
4 (B) - 5 (L)
|
Not on P or N
|
10 kΩ or higher
|
|
1 (RL) - 2 (RB)
|
R
|
Below 1 Ω
|
|
1 (RL) - 2 (RB)
|
Not on R
|
10 kΩ or higher
|
|
2 (RB) - 7 (DL)
|
D
|
Below 1 Ω
|
|
2 (RB) - 7 (DL)
|
Not on D
|
10 kΩ or higher
|
|
2 (RB) - 3 (2L)
|
2
|
Below 1 Ω
|
|
2 (RB) - 3 (2L)
|
Not on 2
|
10 kΩ or higher
|
|
2 (RB) - 8 (LL)
|
L
|
Below 1 Ω
|
|
2 (RB) - 8 (LL)
|
Not on L
|
10 kΩ or higher
|
|