|
Last Modified: 7-3-2017 |
6.8:8.0.40 |
Doc ID: RM0000017FJ006X |
|
Model Year Start: 2007 |
Model: LX470 |
Prod Date Range: [08/2006 -
] |
|
Title:
2UZ-FE ENGINE CONTROL SYSTEM: CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY: INSTALLATION; 2007 MY LX470 [08/2006 - ]
|
INSTALLATION
1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)
|
(a) Install a new O-ring to the oil control valve.
|
|
(b) Apply light coat of engine oil to the O-ring.
(c) Install the oil control valve with the bolt.
Torque:
7.5 N·m {76 kgf·cm, 66in·lbf}
(d) Connect the oil control valve connector.
2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2)
|
(a) Install a new O-ring to the oil control valve.
|
|
(b) Install the oil control valve with the bolt.
Torque:
7.5 N·m {76 kgf·cm, 66in·lbf}
(c) Connect the oil control valve connector.
3. INSTALL INTAKE AIR CONNECTOR PIPE
(a) Install the intake air connector pipe with the 2 clamp bolts and 2 bolts.
Torque:
5.0 N·m {51 kgf·cm, 44in·lbf}
(b) Connect the 3 hoses.
4. INSTALL V-BANK COVER SUB-ASSEMBLY
(a) Install the V-bank cover with the 2 nuts and 2 bolts.
Torque:
7.5 N·m {76 kgf·cm, 66in·lbf}
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
6. PERFORM INITIALIZATION
(a)
Perform initialization
.
NOTICE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
|