3MZ-FE EXHAUST PIPE > INSTALLATION


  1. INSTALL EXHAUST PIPE ASSEMBLY FRONT

  2. INSTALL EXHAUST PIPE SUB-ASSEMBLY FRONT NO.3

  3. INSTALL EXHAUST PIPE ASSEMBLY CENTER

  4. INSTALL EXHAUST TAIL PIPE BAFFLE SUB-ASSEMBLY

  5. INSTALL EXHAUST PIPE ASSEMBLY TAIL

  6. INSTALL OXYGEN SENSOR (for Bank2)

  7. INSTALL OXYGEN SENSOR (for Bank1)

  8. CHECK FOR EXHAUST GAS LEAKS

  9. INSTALL ENGINE UNDER COVER NO.2

  10. INSTALL ENGINE UNDER COVER NO.1