HV RELAY ASSEMBLY > INSPECTION |
| 1. SMR1 AND SYSTEM MAIN RESISTOR |
![]() |
Measure the resistance between the 3 (CON1) and 4 (GND) terminals of the connector for the relay drive of the HV relay assembly.
Increase battery voltage between the 3 (CON1) and 4 (GND) terminals of the connector for the relay drive of the HV relay assembly, and measure the resistance between the terminal of the HV battery side positive connector and the w/ convertor inverter assembly side positive terminal of the HV relay assembly.
| 2. SMR2 |
![]() |
Measure the resistance between the 1 (CON2) and 4 (GND) terminals of the connector for the relay drive of the HV relay assembly.
Increase battery voltage between the 1 (CON2) and 4 (GND) terminals of the connector for the relay drive of the HV relay assembly, and measure the resistance between the terminal of the HV battery side positive connector and the w/ converter inverter assembly side positive terminal of the HV relay assembly.
| 3. SMR3 |
![]() |
Measure the resistance between the 2 (CON3) and 4 (GND) terminals of the connector for the relay drive of the HV relay assembly.
Increase battery voltage between the 2 (CON3) and 4 (GND) terminals of the connector for the relay drive of the HV relay assembly, and measure the resistance between the terminal of the HV battery side negative connector and the w/ converter inverter assembly side negative terminal of the HV relay assembly.