FUEL INJECTOR > INSTALLATION |
| 1. INSTALL FUEL INJECTOR ASSEMBLY |
Install new grommets to each fuel injector.
![]() |
Apply a light coat of spindle oil or gasoline to new O-rings, and install them to each fuel injector.
![]() |
Apply a light coat of spindle oil or gasoline to the place where the fuel delivery pipe contacts the O-ring.
Push the fuel injector while turning it back and forth to install it in the fuel delivery pipe.
![]() |
Install 6 new insulators (B) and the 4 delivery pipe No.1 spacers (A) to the intake manifold.
![]() |
Place the 2 fuel delivery pipes and the 6 fuel injectors together to the intake manifold.
Temporarily install the 4 bolts which are used to attach the fuel delivery pipe to the intake manifold.
Check that the fuel injectors rotate smoothly. If fuel injectors do not rotate smoothly, the probable cause is incorrect installation of the O-ring. Replace with a new O-ring.
Tighten the 4 bolts.
![]() |
Connect the 6 fuel injector connectors.
| 2. INSTALL FUEL PIPE SUB-ASSEMBLY NO.1 |
![]() |
Install 2 new gaskets and the fuel pipe No.2 union bolt (A).
Install 2 new gaskets and the fuel pressure pulsation damper (B).
Install the fuel pipe No.1 with the bolt (C).
| 3. INSTALL INTAKE AIR SURGE TANK |
Install a new gasket to the intake air surge tank.
![]() |
Using a socket hexagon wrench 8 mm, install the intake manifold with the 4 bolts and 2 nuts . Using several steps, tighten the bolts and nuts uniformly in the sequence shown in the illustration.
Connect the ground cable connector.
![]() |
Install the surge tank stay No. 2 (A) with the 2 bolts.
Install the surge tank stay No. 1 (B) with the 2 bolts.
Install the engine hunger No. 1 (C) with the 2 bolts.
![]() |
Connect the ventilation hose.
![]() |
Connect the fuel vapor feed hose (A).
Connect the water by-pass hose No.3 (B).
Connect the water by-pass hose No.2 (C).
Connect the throttle motor connector (D).
| 4. INSTALL EMISSION CONTROL VALVE SET |
![]() |
Install the emission control valve set with the 2 nuts (A).
Connect the fuel vapor feed hose No.2 (B).
Connect the fuel vapor feed hose No.1 (C).
Connect the wire harness clamp (D).
Connect the VSV connector (E).
| 5. INSTALL AIR CLEANER CASE W/ RESONATOR |
![]() |
Install the air cleaner hose No.1 to the throttle body assembly with the hose clamp.
![]() |
Install the air cleaner case w/ resonator with the 5 bolts.
![]() |
Connect the MAF meter connector.
Connect the 2 wire harness clamps to the air cleaner.
![]() |
Connect the ventilation hose No.2.
| 6. INSTALL AIR CLEANER CAP W/ INLET |
![]() |
Install a new air cleaner element to the air cleaner case.
Install the air cleaner cap w/ inlet with the 4 clamps.
Install the air cleaner cap w/ inlet with the 2 bolts.
| 7. INSTALL COOL AIR INTAKE DUCT SEAL |
Install the 4 clips and cool air intake duct seal.
| 8. INSTALL COWL TOP PANEL SUB-ASSEMBLY OUTER |
Remove the 4 shock absorber nuts.
![]() |
Install the 4 bolts, 2 nuts and cowl top panel sub-assembly.
Install the 4 shock absorber nuts (B).
Install the wire harness clamp and grommet (A).
| 9. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY |
![]() |
Install the windshield wiper motor and link assembly with the 5 bolts.
Connect the connector.
| 10. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY |
| 11. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH |
![]() |
Operate the front wiper, and stop the front wiper motor at the automatic stop position.
Clean the wiper arm serrations.
Clean the wiper pivot serrations with a wire brush (when reinstalling).
![]() |
Install the front wiper arm and blade assembly LH with the nut at the position as shown in the illustration.
| 12. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH |
![]() |
Clean the wiper arm serrations.
Clean the wiper pivot serrations with a wire brush (when reinstalling).
![]() |
Install the front wiper arm and blade assembly RH with the 2 nuts at the position as shown in the illustration.
Operate the front wipers while spraying water or washer fluid on the windshield.
Make sure that the wipers function properly and there is no interference with the vehicle body.
| 13. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 14. ADD COOLANT |
Tighten the lower drain plug of the radiator.
Loosen the upper drain plug of the radiator.
![]() |
Install a vinyl tube to the vent plug located on the upper drain plug.
Fill the radiator with engine coolant until the vinyl tube is filled with the coolant.
Tighten the upper drain plug.
Install the radiator cap securely.
Fill the radiator reservoir tank with coolant.
Warm up the engine.
Stop the engine and wait until the coolant cools down.
Remove the radiator cap and check the coolant level inside the radiator.
If the coolant level is below the full level, perform the steps from (a) through (j) and repeat the operation until the coolant level stays the full level.
Recheck the coolant level inside the radiator reservoir tank. If it is below the full level, add the coolant.
| 15. CHECK FOR ENGINE COOLANT LEAKS |
![]() |
Fill the radiator with coolant and attach a radiator cap tester.
Warm up the engine.
Using a radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf*cm, 17 psi), and check that the pressure does not drop.
If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and cylinder head.
| 16. CHECK FOR FUEL LEAKS |
Connect the intelligent tester to the DLC3.
Turn the ignition switch to the ON position and turn the intelligent tester on.
Select the Active Test mode on the intelligent tester to operate the fuel pump.
Check that there are no fuel leaks anywhere in the fuel system after performing maintenance.
| 17. INSTALL ENGINE ROOM COVER SIDE |
![]() |
Install the 5 clips and engine room cover side
| 18. INSTALL ENGINE ROOM SIDE LH COVER |
![]() |
Fit the clips and install the engine room side LH cover.
| 19. PERFORM INITIALIZATION |