AIR CONDITIONING SYSTEM > Heater Water Pump Circuit |

| 1.PERFORM ACTIVE TEST BY INTELLIGENT TESTER |
Connect the intelligent tester to the DLC3.
Turn the ignition switch ON and push the intelligent tester main switch on.
Select the item below in the ACTIVE TEST and check that the relay operates.
| Item | Test Details/Display (Range) | Diagnostic Note |
| WATER PUMP | Water pump / OFF, ON | - |
|
| ||||
| OK | ||
| ||
| 2.PERFORM ACTIVE TEST BY INTELLIGENT TESTER |
Connect the intelligent tester to the DLC3.
Turn the ignition switch ON and push the intelligent tester main switch on.
Select the item below in the ACTIVE TEST and check that the water pump operates.
| Item | Test Details/Display (Range) | Diagnostic Note |
| WATER PUMP | Activate the Water Pump / OFF, ON | - |
|
| ||||
| OK | ||
| ||
| 3.INSPECT MODE MONITOR TERMINAL |
Remove the cover of the fusible link block assembly.
Turn the ignition switch ON.
Measure the voltage when the following conditions are established.
Perform ACTIVE TEST by using the intelligent tester.
Operates the heater water pump.
Measure the voltage according to the value(s) in the table below.
| Result | Proceed to |
| Below 2 V | A |
| More than 4 V | B |
|
| ||||
| A | |
| 4.CHECK HARNESS AND CONNECTOR (J/B NO.2 - BODY GROUND) |
![]() |
Disconnect the connector from J/B No.2 (2D).
Turn the ignition switch ON.
Measure the voltage according to the value(s) in the table below.
| Tester connection | Condition | Specified condition |
| 2D-2 - Body ground | Blower switch: ON | 10 to 14 V |
| 2D-2 - Body ground | Blower switch: OFF | Below 1 V |
|
| ||||
| OK | |
| 5.INSPECT HEATER WATER PUMP ASSEMBLY |
Remove the heater water pump assembly.
![]() |
Disconnect the connector from the heater water pump assembly.
Connect the positive (+) lead to terminal 2 of the heater water pump assembly connector and the negative (-) lead to terminal 1.
|
| ||||
| OK | |
| 6.INSPECT J/B NO.2 (A/C W/P RELAY) |
Turn the ignition switch off.
Remove the J/B No.2.
![]() |
Disconnect the connectors from the J/B No.2.
Connect the positive (+) lead from the battery to terminal 2D-2 (WPB) and the negative (-) lead to terminals 2H-13 (SGND) and 2F-1 (PGND).
Measure the voltage according to the value(s) in the table below.
| Tester connection (Symbols) | Condition | Specified condition |
| 2C-1 (WPL) - 2H-13 (SGND) | Always | Below 1 V |
Connect the positive (+) lead from battery to terminal 2D-2 (WPB) and the negative (-) lead to terminals 2H-13 (SGND), 2F-1 (PGND) and 2H-10 (WP).
Measure the voltage according to the value(s) in the table below.
| Tester connection (Symbols) | Condition | Specified condition |
| 2C-1 (WPL) - 2H-13 (SGND) | Always | 10 to 14 V |
|
| ||||
| OK | ||
| ||
| 7.CHECK HARNESS AND CONNECTOR (HYBRID VEHICLE CONTROL ECU - BODY GROUND) |
![]() |
Disconnect the connector from the hybrid vehicle control ECU.
Measure the voltage according to the value(s) in the table below.
| Tester connection (Symbols) | Condition | Specified condition |
| H31-4 (WP) - Body ground | Ignition switch: ON | 10 to 14 V |
| H31-4 (WP) - Body ground | Ignition switch: OFF | Below 1 V |
|
| ||||
| OK | |
| 8.INSPECT HYBRID VEHICLE CONTROL ECU |
![]() |
Reconnect the connectors to the hybrid vehicle control ECU.
Turn the ignition switch ON.
Measure the voltage when these conditions are established.
Test conditions:
Perform ACTIVE TEST by the intelligent tester.
Operates the heater water pump.
Measure the voltage according to the value(s) in the table below.
| Tester connection (Symbols) | Condition | Specified condition |
| H31-4 (WP) - Body ground | Not operate the heater water pump | 10 to 14 V |
| H31-4 (WP) - Body ground | Operate the heater water pump | Below 1 V |
|
| ||||
| OK | |
| 9.INSPECT HEATER WATER PUMP ASSEMBLY |
Remove the heater water pump assembly.
![]() |
Disconnect the connector from the heater water pump assembly.
Connect the positive (+) lead to terminal 2 of the heater water pump assembly connector and the negative (-) lead to terminal 1.
|
| ||||
| OK | |
| 10.INSPECT J/B NO.2 (A/C W/P RELAY) |
Turn the ignition switch off.
Remove the J/B No.2.
![]() |
Disconnect the connectors from the J/B No.2.
Connect the positive (+) lead from the battery to terminal 2D-2 (WPB) and the negative (-) lead to terminals 2H-13 (SGND) and 2F-1 (PGND).
Measure the voltage according to the value(s) in the table below.
| Tester connection (Symbols) | Condition | Specified condition |
| 2C-1 (WPL) - 2H-13 (SGND) | Always | Below 1 V |
Connect the positive (+) lead from battery to terminal 2D-2 (WPB) and the negative (-) lead to terminals 2H-13 (SGND), 2F-1 (PGND) and 2H-10 (WP).
Measure the voltage according to the value(s) in the table below.
| Tester connection (Symbols) | Condition | Specified condition |
| 2C-1 (WPL) - 2H-13 (SGND) | Always | 10 to 14 V |
|
| ||||
| OK | ||
| ||
| 11.CHECK HARNESS AND CONNECTOR (J/B NO.2 - BODY GROUND) |
![]() |
Disconnect the connector from the J/B No.2 (2D).
Turn the ignition switch ON.
Measure the voltage according to the value(s) in the table below.
| Tester connection | Condition | Specified condition |
| 2D-2 - Body ground | Blower switch: ON | 10 to 14 V |
| 2D-2 - Body ground | Blower switch: OFF | Below 1 V |
|
| ||||
| OK | |
| 12.INSPECT J/B NO.2 (A/C W/P RELAY) |
Turn the ignition switch off.
Remove the J/B No.2.
![]() |
Disconnect the connectors from the J/B No.2.
Connect the positive (+) lead from the battery to terminal 2D-2 (WPB) and the negative (-) lead to terminals 2H-13 (SGND) and 2F-1 (PGND).
Measure the voltage according to the value(s) in the table below.
| Tester connection (Symbols) | Condition | Specified condition |
| 2C-1 (WPL) - 2H-13 (SGND) | Always | Below 1 V |
Connect the positive (+) lead from battery to terminal 2D-2 (WPB) and the negative (-) lead to terminals 2H-13 (SGND), 2F-1 (PGND) and 2H-10 (WP).
Measure the voltage according to the value(s) in the table below.
| Tester connection (Symbols) | Condition | Specified condition |
| 2C-1 (WPL) - 2H-13 (SGND) | Always | 10 to 14 V |
|
| ||||
| OK | ||
| ||