HOOD > REASSEMBLY

for Preparation Click here



1. INSTALL CUSHION RUBBER


2. INSTALL HOOD LOCK ASSEMBLY


    B069274E01
  1. Connect the connector and the cable.

  1. Install the hood lock assembly with the 3 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Install a nut cap.



3. INSTALL HOOD LOCK CONTROL CABLE COVER


4. INSTALL COOL AIR INTAKE DUCT SEAL


5. INSTALL HOOD HINGE ASSEMBLY LH


    B069272
  1. Install the hood hinge assembly LH with the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



6. INSTALL HOOD HINGE ASSEMBLY RH
  1. Install the hood hinge assembly RH with the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



7. INSTALL HOOD SUB-ASSEMBLY


    B069273
  1. Install the hood sub-assembly with the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

    HINT:
    Use the same procedure for removal on the RH side.



8. INSTALL HOOD TO FRONT FENDER SEAL RH


9. INSTALL HOOD TO FRONT FENDER SEAL LH


10. INSTALL HOOD TO RADIATOR SUPPORT SEAL


11. INSTALL HOOD SUPPORT ROD

NOTICE:
  1. Do not touch the extendable portion of the rod to prevent foreign objects from attaching to the rod surface.
  2. Do not push sideways on the rod because the rod may bend.

  1. Install the hood support rod to the body with the bolt.

    Torque:
    19.5 N*m{ 199 kgf*cm , 14 ft.*lbf }

  1. Install the hood support rod and clip to the hood sub-assembly.



12. INSTALL HOOD INSULATOR


13. INSTALL RADIATOR GRILLE


14. INSTALL AUXILIARY CATCH RELEASE LEVER ASSEMBLY


    B069271
  1. Install the auxiliary catch release lever assembly and hood auxiliary catch hook assembly as a unit with the 3 bolts.

    Torque:
    7.0 N*m{ 71 kgf*cm , 62 in.*lbf }