LIGHTING SYSTEM > AFS ECU Power Source Circuit

for Preparation Click here


DESCRIPTION

This circuit detects the state of the ignition switch and send it to the AFS ECU.

WIRING DIAGRAM


B110608E02


INSPECTION PROCEDURE

1.INSPECT FUSE
  1. Inspect the ECU-IG No.2 fuse and AM1 fuse in the instrument panel junction block assembly.

    Resistance:
    Below 1 Ω



NG
REPLACE FUSE
OK


2.INSPECT RELAY


    E064835
  1. Remove the IG1 relay from the instrument panel J/B assembly.

  1. Measure the resistance according to the value(s) in the table below.

    Resistance:
    Tester connection
    Condition
    Specified resistance
    3 - 5
    Always
    10 kΩ or higher
    3 - 5
    Apply B+ between the terminal 1 and 2
    Below 1 Ω



NG
REPLACE RELAY
OK


3.INSPECT AFS ECU


    E069130E07
  1. Measure the voltage according to the value(s) in the table below.

    Voltage:
    Tester connection
    Condition
    Specified condition
    A17-2 (IG) - A17-1 (E1)
    Ignition switch OFF → ON
    Below 1 V → 10 to 14 V
    A17-12 (IGS) - A17-1 (E1)
    Ignition switch OFF → ON
    Below 1 V → 10 to 14 V



NG
Go to step 4
OK

PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE 

4.CHECK HARNESS AND CONNECTOR (AFS ECU - BODY GROUND)


    E069284E02
  1. Disconnect the A17 connector from headlight swivel ECU assembly.

  1. Measure the resistance according to the value(s) in the table below.

    Resistance:
    Tester connection
    Condition
    Specified condition
    A17-1 (E1) - Body ground
    Always
    Below 1 Ω
    A17-11 (E1S) - Body ground
    Always
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


5.INSPECT INSTRUMENT PANEL J/B ASSEMBLY


  1. Measure the voltage according to the value(s) in the table below.


    E068612E04

    Voltage:
    Tester connection
    Condition
    Specified condition
    1F-19 - Body ground
    Ignition switch OFF → ON
    Below 1 V → 10 to 14 V



NG
Go to step 6
OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (INSTRUMENT PANEL J/B ASSEMBLY - AFS ECU) 

6.INSPECT INSTRUMENT PANEL J/B ASSEMBLY (POWER SOURCE CIRCUIT)


  1. Measure the voltage according to the value(s) in the table below.


    E068612E03

    Voltage:
    Tester connection
    Condition
    Specified condition
    1A-1 - Body ground
    Always
    10 to 14 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - INSTRUMENT PANEL J/B ASSEMBLY)
OK


7.INSPECT IGNITION SWITCH


    E068971E01
  1. Disconnect the ignition switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Resistance:
    Tester connection
    Condition
    Specified condition
    2 - 4
    Ignition switch OFF
    10 kΩ or higher
    2 - 4
    Ignition switch ON
    Below 1 Ω



NG
REPLACE IGNITION SWITCH
OK


8.INSPECT INSTRUMENT PANEL J/B ASSEMBLY


  1. Measure the voltage according to the value(s) in the table below.


    E068613E02

    Voltage:
    Tester connection
    Condition
    Specified condition
    1I-4 - Body ground
    Always
    10 to 14 V



NG
REPLACE INSTRUMENT PANEL J/B ASSEMBLY
OK


9.INSPECT INSTRUMENT PANEL J/B ASSEMBLY


  1. Measure the voltage according to the value(s) in the table below.


    E068613E02

    Voltage:
    Tester connection
    Condition
    Specified condition
    1I-9 - Body ground
    Ignition switch OFF → ON
    Below 1 V → 10 to 14 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


10.CHECK HARNESS AND CONNECTOR (INSTRUMENT PANEL J/B ASSEMBLY - BODY GROUND)
  1. Disconnect the 1F connector from the instrument panel junction block assembly.



  1. Measure the resistance according to the value(s) in the table below.


    E068612E04

    Resistance:
    Tester connection
    Condition
    Specified condition
    1F-10 - Body ground
    Always
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE INSTRUMENT PANEL J/B ASSEMBLY