METER / GAUGE SYSTEM > Entire Combination Meter does not Operate

for Preparation Click here


WIRING DIAGRAM


E110182E01


INSPECTION PROCEDURE

1.INSPECT COMBINATION METER ASSEMBLY


    E110175E03
  1. Disconnect the C8 and C9 connectors.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    C8-1 (POWER GND)
    - Body ground
    Always
    Below 1 Ω
    C9-1 (SIGNAL GND)
    - Body ground
    Always
    Below 1 Ω

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    C8-8 (IG2) -
    Body ground
    Turn the ignition switch to the ON position
    10 to 16 V
    C8-15 (ECU +B) -
    Body ground
    Always
    10 to 16 V
    C8-16 (DOME +B) -
    Body ground
    Always
    10 to 16 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE COMBINATION METER ASSEMBLY