CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY > INSTALLATION

for Preparation Click here



1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)


    A111110
  1. Apply a coat of engine oil to an O-ring of the sensor.

  1. Install the camshaft timing oil control valve with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Connect the camshaft timing oil control valve connector.



2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2)


    A111109
  1. Apply a coat of engine oil to an O-ring of the sensor.

  1. Install the camshaft timing oil control valve with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

    Connect the camshaft timing oil control valve connector.



3. INSTALL AIR CLEANER CASE W/ RESONATOR


    A109267
  1. Install the air cleaner hose No.1 to the throttle body assembly with the hose clamp.



    A106878
  1. Install the air cleaner case w/ resonator with the 5 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }



    A109270
  1. Connect the MAF meter connector.

  1. Connect the 2 wire harness clamps to the air cleaner.



    A109893
  1. Connect the ventilation hose No.2.



4. INSTALL AIR CLEANER CAP W/ INLET


    A106877E01
  1. Install a new air cleaner element to the air cleaner case.

  1. Install the air cleaner cap w/ inlet with the 4 clamps.

  1. Install the air cleaner cap w/ inlet with the 2 bolts.

    Torque:
    7.0 N*m{ 71 kgf*cm , 62 in.*lbf }



5. INSTALL COOL AIR INTAKE DUCT SEAL
  1. Install the 4 clips and cool air intake duct seal.



6. INSTALL ENGINE ROOM COVER SIDE


    A109835
  1. Install the 5 clips and engine room cover side



7. INSTALL ENGINE ROOM SIDE LH COVER


    A108719
  1. Fit the clips and install the engine room side LH cover.