ROOF DRIP SIDE FINISH MOULDING > INSTALLATION

for Preparation Click here



1. INSTALL ROOF DRIP SIDE FINISH MOULDING CLIP NO.1

HINT:
Only when replacing the clips.



    B050678E01
  1. Remove the tape that remains on the mounting surface of the body and then clean the surface with white gasoline.

  1. Using a heat light, heat up the clip installation surfaces of the body and moulding.

    Heating temperature:
    Body
    40 to 60°C (104 to 140°F)
    Moulding
    20 to 30°C (68 to 86°F)

    NOTICE:
    Do not heat them excessively.

  1. Set the new clips into the positions as shown in the illustration, and press-fit those clips by hands to install them.

  1. The installation of the moulding should be carried out when 30 minutes or more have passed after press-fitting the clips.

    HINT:
    1. Initial hardening time is 30 minutes
    2. Hardening completes after 24 hours



2. INSTALL ROOF DRIP SIDE FINISH MOULDING REAR


3. INSTALL ROOF DRIP SIDE FINISH MOULDING CENTER


4. INSTALL ROOF DRIP SIDE FINISH MOULDING CENTER


5. INSTALL ROOF DRIP SIDE FINISH MOULDING


6. INSTALL ROOF DRIP SIDE MOULDING COVER FRONT