ROOF DRIP SIDE FINISH MOULDING > INSTALLATION |
| 1. INSTALL ROOF DRIP SIDE FINISH MOULDING CLIP NO.1 |
![]() |
Remove the tape that remains on the mounting surface of the body and then clean the surface with white gasoline.
Using a heat light, heat up the clip installation surfaces of the body and moulding.
| Body | 40 to 60°C (104 to 140°F) |
| Moulding | 20 to 30°C (68 to 86°F) |
Set the new clips into the positions as shown in the illustration, and press-fit those clips by hands to install them.
The installation of the moulding should be carried out when 30 minutes or more have passed after press-fitting the clips.
| 2. INSTALL ROOF DRIP SIDE FINISH MOULDING REAR |
| 3. INSTALL ROOF DRIP SIDE FINISH MOULDING CENTER |
| 4. INSTALL ROOF DRIP SIDE FINISH MOULDING CENTER |
| 5. INSTALL ROOF DRIP SIDE FINISH MOULDING |
| 6. INSTALL ROOF DRIP SIDE MOULDING COVER FRONT |