STEP 1. Resistance measurement at ETACS-ECU connector (GND, SGND terminal).
(1) Disconnect the connector, and measure at the wiring harness side.
(2) Measure the resistance between the ETACS-ECU connector (GND, SGND terminal) and body earth.OK: Continuity exists (2 Ω or less)
Is the check result normal?
Go to Step 3.
Go to Step 2.
STEP 2. Check of open circuit in GND, SGND line between ETACS-ECU connector and body earth.
STEP 3. Voltage measurement at ETACS-ECU connector (+B1, +B2 terminal).
(1) Disconnect the connector, and measure at the wiring harness side.
(2) Measure the voltage between the ETACS-ECU connector (+B1, +B2 terminal) and body earth.OK: System voltage
Is the check result normal?
Go to Step 5.
Go to Step 4.
STEP 4. Check of short to power supply, short to earth, and open circuit in +B1, +B2 line between fusible link and ETACS-ECU connector.
STEP 5. Retest the system