Relay
Inspection
LIGHTING (EXTERIOR)
RELAY
UNIT INSPECTION
1. Inspection of the H-LP relay
(1) Measure the resistance between connector terminals.
Resistance
| Inspection terminals |
Inspection conditions |
Standard value |
|---|---|---|
| 3 - 5 |
When battery voltage is not applied between terminals 1 and 2. |
10 kΩ or more |
| When battery voltage is applied between terminals 1 and 2. |
Less than 1 Ω |
Captions in illustration
| *a |
Relay not connected (H-LP relay) |
2. Inspection of the DIM relay
(1) Measure the resistance between connector terminals.
Resistance
| Inspection terminals |
Inspection conditions |
Standard value |
|---|---|---|
| 3 - 5 |
When battery voltage is not applied between terminals 1 and 2. |
10 kΩ or more |
| When battery voltage is applied between terminals 1 and 2. |
Less than 1 Ω |
Captions in illustration
| *a |
Relay not connected (DIM relay) |
3. Inspection of the RR FOG relay
(1) Measure the resistance between connector terminals.
Resistance
| Inspection terminals |
Inspection conditions |
Standard value |
|---|---|---|
| 3 - 5 |
When battery voltage is not applied between terminals 1 and 2. |
10 kΩ or more |
| When battery voltage is applied between terminals 1 and 2. |
Less than 1 Ω |
Captions in illustration
| *a |
Relay not connected (RR FOG relay) |