FUEL INJECTOR > INSTALLATION |
| 1. INSTALL FUEL INJECTOR |
![]() |
Install a new insulator onto each fuel injector.
Apply a light coat of spindle oil or gasoline to a new O-ring and install it onto each fuel injector.
![]() |
While turning the fuel injector left and right, install it onto the fuel delivery pipe.
Position the fuel injector connector facing outward.
| 2. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY |
![]() |
Place the fuel delivery pipe together with the 6 fuel injectors on the intake manifold.
Provisionally install the 6 bolts, which are used to hold the fuel delivery pipe, onto the intake manifold.
Check that the fuel injectors rotate smoothly.
Position the fuel injector connector facing outward.
Tighten the 6 bolts, which are used to hold the fuel delivery pipe, to the intake manifold.
Connect the 6 fuel injector connectors.
| 3. CONNECT FUEL PIPE SUB-ASSEMBLY |
Push the tube connector into the pipe until the tube connector makes a "click" sound.
Install the fuel pipe clamp.
| 4. CONNECT NO. 1 FUEL PIPE SUB-ASSEMBLY |
Push the tube connector into the pipe until the tube connector makes a "click" sound.
Install the fuel pipe clamp.
| 5. INSTALL INTAKE AIR SURGE TANK |
![]() |
Install a new gasket and the intake air surge tank with the 2 nuts.
Using an 8 mm socket hexagon wrench, install the 4 bolts.
![]() |
Install the 3 upper bolts which are used to secure the 2 surge tank stays and throttle body bracket.
![]() |
Install the 3 wire harness clamps and hose clamp.
Connect the throttle motor connector.
Connect the 2 VSV connectors.
![]() |
Connect the ventilation hose.
![]() |
Connect the fuel vapor feed hose.
![]() |
Connect the No. 4 water by-pass hose.
![]() |
Connect the No. 5 water by-pass hose.
| 6. INSTALL AIR CLEANER ASSEMBLY |
![]() |
Install the air cleaner with the 2 bolts.
Tighten the 2 hose clamps.
![]() |
Install the 2 wire harness clamps.
Connect the mass air flow meter connector.
Connect the vacuum hose.
![]() |
Connect the ventilation hose No. 2.
| 7. CONNECT NO. 2 VENTILATION HOSE |
![]() |
Connect the No. 2 ventilation hose.
| 8. INSTALL V-BANK COVER |
![]() |
Install the V-bank cover with the 2 nuts.
| 9. CONNECT BATTERY NEGATIVE TERMINAL |
| 10. ADD ENGINE COOLANT |
Slowly fill the system with engine coolant.
Install the radiator cap securely.
Bleed the cooling system.
Open the heater water valve while warming up the engine.
Maintain the engine speed at 2,000 to 2,500 rpm and warm up the engine.
Stop the engine and wait until the coolant cools down.
Add coolant into the reservoir until the coolant level is FULL.
| 11. CHECK FOR ENGINE COOLANT LEAKAGE |
Fill the radiator with coolant and attach a radiator cap tester.
Pump it to 118 kPa (1.2 kgf/cm2 17.1 psi), then check for leakage.
| 12. CHECK FOR FUEL LEAKAGE |