Home › TRANSMISSION · A750F AUTOMATIC TRANSMISSION › AUTOMATIC TRANSMISSION SYSTEM (for 1GR-FE)

DTC    P2716    Pressure Control Solenoid "D" Electrical (Shift Solenoid Valve SLT)

for Preparation Click here


DESCRIPTION

Refer to DTC P2714 .

DTC No.
DTC Detection Condition
Trouble Area
P2716
Open or short is detected in shift solenoid valve SLT circuit for 1 second or more while driving (1-trip detection logic).
  1. Open or short in shift solenoid valve SLT circuit
  2. Shift solenoid valve SLT
  3. ECM

MONITOR DESCRIPTION

When an open or short in the linear solenoid valve (SLT) circuit is detected, the ECM interprets this as a fault. The ECM will turn on the MIL and store the DTC.

MONITOR STRATEGY


Related DTCs
P2716: Shift solenoid valve SLT/Range check
Required sensors/Components
Shift solenoid valve SLT
Frequency of operation
Continuous
Duration
1 sec.
MIL operation
Immediately
Sequence of operation
None

TYPICAL ENABLING CONDITIONS


All: 
The monitor will run whenever this DTC is not present.
None

Case 1: 
Solenoid current cut status
Not cut
Battery voltage
11 V or more
Ignition switch
ON
Starter
OFF

Case 2: 
Battery voltage
8 V or more
Ignition switch
ON
Starter
OFF

TYPICAL MALFUNCTION THRESHOLDS


Case 1: 
Solenoid status (SLT) from IC
Fail (Open or short)

Case 2: 
Hybrid IC status
Fail

COMPONENT OPERATING RANGE


Output signal duty.
Less than 100%

WIRING DIAGRAM


C110586E17


INSPECTION PROCEDURE

1.INSPECT TRANSMISSION WIRE (SLT)


    C110342E38
  1. Disconnect the transmission wire connector from the transmission.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    20°C (68°F)
    14 (SLT+) - 6 (SLT-)
    5.0 to 5.6 Ω

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance (Check for short):
    Tester Connection
    Specified Condition
    14 (SLT+) - Body ground
    10 kΩ or higher
    6 (SLT-) - Body ground
    ↑



NG
Go to step 3
OK


2.CHECK HARNESS AND CONNECTOR (TRANSMISSION WIRE - ECM)


    G035616E85
  1. Connect the transmission wire connector to the transmission.

  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    20°C (68°F)
    E5-13 (SLT+) - E5-12 (SLT-)
    5.0 to 5.6 Ω

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance (Check for short):
    Tester Connection
    Specified Condition
    E5-13 (SLT+) - Body ground
    10 kΩ or higher
    E5-12 (SLT-) - Body ground
    ↑



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE ECM 

3.INSPECT SHIFT SOLENOID VALVE SLT


    G020767E08
  1. Remove the shift solenoid valve SLT.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    20°C (68°F)
    1 - 2
    5.0 to 5.6 Ω

  1. Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the movement of the valve.

    OK:
    The solenoid makes an operating sound.



NG
REPLACE SHIFT SOLENOID VALVE SLT
OK

REPAIR OR REPLACE TRANSMISSION WIRE