Home › ENGINE ยท 1GR-FE › LUBRICATION › OIL PUMP

OIL PUMP > INSTALLATION

for Preparation Click here



1. INSTALL TIMING CHAIN COVER OIL SEAL


    A076451E01
  1. Using SST and hammer, tap in a new oil seal until its surface is flush with the timing chain cover edge.

    SST
    09226-10010  

  1. Apply MP grease to the oil seal lip.



2. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY
  1. Remove any old packing (FIPG) material. Be careful not to drop any oil on the contact surfaces of the timing chain cover, cylinder head and cylinder block.



    G038103
  1. Install a new O-ring onto the LH cylinder head as shown in the illustration.



    G038104E01
  1. Apply continuous beads of seal packing (diameter 3 to 4 mm (0.12 to 0.16 in.)) to the 4 locations as shown in the illustration.

    Seal packing:
    Part No. 08826-00080 or equivalent



    A076303E10
  1. Apply continuous beads of seal packing (diameter 3 to 4 mm (0.12 to 0.16 in.)) to the timing chain cover as shown in the illustration.

    Seal packing:
    Water pump part:
    Part No. 08826-00100 or equivalent
    Other parts:
    Part No. 08826-00080 or equivalent

    NOTICE:
    1. Install the timing chain cover within 3 minutes of applying the seal packing. Timing chain cover bolts and nuts must be tightened within 15 minutes of installation. Otherwise, the seal packing must be removed and reapplied.
    2. Do not apply seal packing to portion A shown in the illustration.



    A076304E02
  1. Align the key way of the oil pump drive rotor with the rectangular portion of the crankshaft timing gear, and slide the timing chain cover into place.



    A076447E01
  1. Install the timing chain cover with the 24 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.

    Torque:
    23 N*m{ 235 kgf*cm , 17 ft.*lbf }

    NOTICE:
    Pay attention not to wrap the chain and slipper over the timing chain cover seal line.

    Each bolt length is as follows:
    Bolt
    Length
    A
    25 mm (0.98 in.)
    B
    55 mm (2.17 in.)



3. INSTALL OIL FILTER BRACKET SUB-ASSEMBLY
  1. Install a new gasket and the oil filter bracket with the 3 bolts and 2 nuts.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }



4. INSTALL VVT SENSOR


    G038106
  1. LH bank side VVT sensor.

    1. Apply a light coat of engine oil to an O-ring of the VVT sensor.

    2. Install the VVT sensor with the bolt.

      Torque:
      8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

    3. Connect the VVT sensor connector.



    4. A076414
    5. Connect the water by-pass hoses No. 4 and No. 5.



    G038105
  1. RH bank side VVT sensor.

    1. Apply a light coat of engine oil to an O-ring of the VVT sensor.

    2. Install the VVT sensor with the bolt.

      Torque:
      8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

    3. Connect the VVT sensor connector.



5. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY
  1. Install the camshaft timing oil control valves to each cylinder head, and tighten the 2 bolts.



6. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH
  1. Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder head, timing chain cover and cylinder head cover.



    A076311E02
  1. Apply a continuous bead of seal packing (diameter: 2 to 3 mm (0.08 to 0.12 in.)) to the cylinder head and timing chain cover as shown in the illustration.

    Seal packing:
    Part No. 08826-00080 or equivalent

    NOTICE:
    Install the cylinder head cover within 3 minutes after applying seal packing. After installing it, the cylinder head cover bolts and nuts must be tightened within 15 minutes. Otherwise the seal packing must be removed and reapplied.

  1. Install the seal washers to the bolts.



    A076503E02
  1. Install the cylinder head cover with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.

    Torque:
    For bolt A:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }
    For bolt B:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
    Nut:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }



7. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY RH
  1. Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder head, timing chain cover and cylinder head cover.



    A076310E02
  1. Apply a continuous bead of seal packing (diameter: 2 to 3 mm (0.08 to 0.12 in.)) to the cylinder head and timing chain cover as shown in the illustration.

    Seal packing:
    Part No. 08826-00080 or equivalent

    NOTICE:
    Install the cylinder head cover within 3 minutes after applying seal packing. After installing it, cylinder head cover bolts and nuts must be tightened within 15 minutes. Otherwise the seal packing must be removed and reapplied.

  1. Install the seal washers to the bolts.



    A072943E02
  1. Install the cylinder head cover with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.

    Torque:
    For bolt A:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }
    For bolt B:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
    Nut:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }



8. INSTALL IGNITION COIL ASSEMBLY

Torque:
10 N*m{ 102 kgf*cm , 7 ft.*lbf }



9. INSTALL INTAKE AIR SURGE TANK
  1. Install a new gasket to the intake air surge tank.

  1. Using the socket hexagon wrench 8, install the intake air surge tank with the 4 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }

  1. Install the 2 intake air surge tank nuts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }

  1. Install the 2 surge tank stays with the 4 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the oil baffle plate with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Install the throttle body bracket with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the 3 wire harness clamps and hose clamp.

  1. Connect the throttle body with motor connector.

  1. Connect the 2 VSV connectors.

  1. Connect the ventilation hose.

  1. Connect the fuel vapor feed hose.

  1. Connect the 2 water by-pass hoses.



10. INSTALL OIL PAN SUB-ASSEMBLY
  1. Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder block, rear oil seal retainer and oil pan.



    A076305E01
  1. Install the 4 stud bolts.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }



    A076306
  1. Install a new O-ring to the oil pump.



    A076307E01
  1. Apply a continuous bead of seal packing (diameter: 3 to 4 mm (0.12 to 0.16 in.)) to the oil pan as shown in the illustration.

    Seal packing:
    Part No. 08826-00080 or equivalent

    NOTICE:
    Install the oil pan within 3 minutes after applying seal packing. After installing it, the oil pan bolts and nuts must be tightened within 15 minutes. Otherwise the seal packing must be removed and reapplied.



    A072952E02
  1. Install the oil pan with the 17 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.

    Torque:
    For bolt A:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    For bolt B:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    For bolt C:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }
    For nut:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    HINT:
    Each bolt length is as follows:
    A: 25 mm (0.98 in.)
    B: 45 mm (1.77 in.)
    C: 14 mm (0.55 in.)



11. INSTALL OIL STRAINER SUB-ASSEMBLY


    A072951
  1. Install a new gasket and the oil strainer with the 2 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }



12. INSTALL NO.2 OIL PAN SUB-ASSEMBLY
  1. Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the oil pan and No. 2 oil pan.



    A076308E02
  1. Apply a continuous bead of seal packing (diameter: 3 to 4 mm (0.12 to 0.16 in.)) as shown in the illustration.

    Seal packing:
    Part No. 08826-00080 or equivalent

    NOTICE:
    Install the No. 2 oil pan within 3 minutes after applying seal packing. After installing it, the No. 2 oil pan bolts and nuts must be tightened within 15 minutes. Otherwise the seal packing must be removed and reapplied.



    A072949
  1. Install the No. 2 oil pan with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.

    Torque:
    For bolt:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
    For nut:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



13. INSTALL CRANKSHAFT PULLEY


    A076309E01
  1. Using SST, install the pulley set bolt.

    SST
    09213-54015   (91651-60855)
    09330-00021  

    Torque:
    250 N*m{ 2,549 kgf*cm , 184 ft.*lbf }



14. INSTALL NO.1 IDLER PULLEY SUB-ASSEMBLY


    A076438E01
  1. Install the idler pulley with the bolt.

    Torque:
    54 N*m{ 551 kgf*cm , 40 ft.*lbf }

    HINT:
    "DOUBLE" is marked on the No. 1 idler pulley to distinguish it from the No. 2 idler pulley.



15. INSTALL NO.2 IDLER PULLEY SUB-ASSEMBLY


    A076338
  1. Install the 2 idler pulleys with the 2 bolts.

    Torque:
    39 N*m{ 398 kgf*cm , 29 ft.*lbf }



16. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY


    A076445E02
  1. Temporarily install the V-ribbed belt tensioner with the 5 bolts.

  1. Install the V-ribbed belt tensioner by tightening the bolt 1 and bolt 2 in the order shown in the illustration.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }

  1. Tighten the other bolts.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }

    HINT:
    Each bolt length is as follows:
    A: 70 mm (2.76 in.)
    B: 33 mm (1.30 in.)



17. INSTALL COOLER COMPRESSOR ASSEMBLY
  1. Install the cooler compressor assembly with the 4 bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

  1. Connect the cooler compressor assembly connector.



    A076416
  1. Install the suction hose sub-assembly with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



18. REMOVE GENERATOR ASSEMBLY
  1. Install the generator assembly with the 2 bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }

  1. Install the wire harness clamp bracket with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Connect the wire harness.

    1. Connect the wire harness to the terminal B and install the nut.

      Torque:
      9.8 N*m{ 100 kgf*cm , 7 ft.*lbf }

    2. Connect the connector to the generator assembly.

    3. Install the wire harness stay with the bolt.

      Torque:
      8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



19. REMOVE VANE PUMP ASSEMBLY


    A076444
  1. Install the vane pump with the 2 bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }

    NOTICE:
    Do not hit the pulley to other parts when installing the vane pump.

  1. Connect the P/S oil pressure switch connector.



20. INSTALL WATER INLET


    A076340
  1. Install a new O-ring to the water outlet pipe.

  1. Install a new gasket to the water pump.

  1. Apply soapy water to the O-ring.



    A076337
  1. Install the water inlet with the 5 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the 5 water by-pass hoses.

  1. Connect the 2 radiator hoses.

  1. Connect the 2 oil cooler hoses (with oil cooler).



21. INSTALL OIL LEVEL GAUGE GUIDE


    A076314E02
  1. Install a new O-ring to the oil level gauge guide.

  1. Apply a light coat of engine oil to the O-ring.

  1. Push in the oil level gauge guide end into the guide hole of the oil pan.

  1. Install the oil level gauge guide with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }



22. INSTALL AIR CLEANER ASSEMBLY


    A075596E01
  1. Install the air cleaner with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Tighten the 2 hose clamps.



    A075595E01
  1. Install the 2 wire harness clamps.

  1. Connect the mass air flow meter connector.

  1. Connect the vacuum hose.



    A075594E01
  1. Connect the ventilation hose No. 2.



23. CONNECT VENTILATION HOSE NO.2


24. INSTALL FAN WITH FLUID COUPLING
  1. Temporarily install the fan with fluid coupling with the 4 nuts.



25. INSTALL FAN AND GENERATOR V BELT


    A076442E02
  1. While turning the belt tensioner counterclockwise, align with its holes, and then insert a bar of 6 mm (0.24 in.) into the holes to fix the belt tensioner.

  1. Install the V-ribbed belt.

  1. While turning the belt tensioner counterclockwise, remove the bar.



    A076443E02
  1. If it is hard to install the V-ribbed belt, perform the following procedure.

    1. Put the V-ribbed belt on all parts except the P/S pump, as shown in the illustration.

    2. While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the P/S pump.



26. FULLY TIGHTEN FAN WITH FLUID COUPLING
  1. Tighten the 4 fluid coupling bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



27. INSTALL RADIATOR SUPPORT SEAL UPPER


28. INSTALL BATTERY


29. INSTALL DIFFERENTIAL CARRIER ASSEMBLY FRONT


    C097020
  1. Connect the actuator hose and connector.

  1. Install the No. 1 mounting support with the 3 bolts.

    Torque:
    186 N*m{ 1,900 kgf*cm , 137 ft.*lbf }

  1. Install the No. 2 mounting support with the 2 bolts.

    Torque:
    160 N*m{ 1,630 kgf*cm , 118 ft.*lbf }

  1. Install the No. 3 front differential support with the 2 bolts.

    Torque:
    108 N*m{ 1,100 kgf*cm , 80 ft.*lbf }

  1. Support the front differential with a jack.

  1. Install the 2 front mounting bolts and nuts.

    Torque:
    137 N*m{ 1,400 kgf*cm , 101 ft.*lbf }

  1. Install the No. 1 front differential mount nut.

    Torque:
    87 N*m{ 887 kgf*cm , 64 ft.*lbf }

  1. Install the front differential breather tube bracket with the bolt.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Lower the jack.



30. INSTALL POWER STEERING LINK ASSEMBLY


    F042726
  1. Install the power steering link assembly with the 2 bolts and 2 nuts.

    Torque:
    100 N*m{ 1,020 kgf*cm , 74 ft.*lbf }

    NOTICE:
    The nut has a detent, so never turn the nut, be sure to turn the bolt.

    HINT:
    Insert the bolt and slide it with the gear assembly as a unit and then install the bolt on the frame.



31. ADD ENGINE OIL
  1. Fill with fresh engine oil.

    Capacity:
    Drain and refill with oil filter change
    5.2 liters (5.5 US qts, 4.6 lmp. qts)
    Drain and refill without oil filter change
    4.9 liters (5.2 US qts, 4.3 lmp. qts)
    Dry fill
    6.0 liters (6.3 US qts, 5.3lmp. qts)

  1. Reinstall the oil filler cap.



32. ADD ENGINE COOLANT
  1. Slowly fill the system with engine coolant.

    Capacity:
    9.8 liters (10.4 Us qts, 8.6 Imp. qts)

    HINT:
    1. Use of improper coolants may damage the engine cooling system.
    2. Use only Toyota Super Long Life Coolant or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, and non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
    3. New Toyota vehicles are filled with Toyota Super Long Life Coolant (color is pink, premixed ethylene glycol concentration is approximately 50 % and freezing temperature is -35°C (-31°F)). When replacing the coolant, Toyota Super Long Life Coolant is recommended.
    4. Observe the coolant level inside the radiator by pressing the inlet and outlet radiator hoses several times by hand. If the coolant level goes down, add the coolant.

    NOTICE:
    Do not substitute plain water for engine coolant.

  1. Install the radiator cap securely.

  1. Bleed the cooling system.

    1. Open the heater water valve while warming up the engine.

    2. Maintain the engine speed at 2,000 to 2,500 rpm and warm up the engine.

  1. Stop the engine and wait until the coolant cools down.

  1. Add coolant into the reservoir until the coolant level is FULL.



33. INSPECT ENGINE OIL LEAKS


34. INSPECT ENGINE COOLANT LEAKAGE
  1. Fill the radiator with coolant and attach a radiator cap tester.

  1. Pump it to 118 kPa (1.2 kgf/cm2 17.1 psi), then check for leakage.



35. INSTALL V-BANK COVER
  1. Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }