OIL PUMP > INSTALLATION |
| 1. INSTALL TIMING CHAIN COVER OIL SEAL |
![]() |
Using SST and hammer, tap in a new oil seal until its surface is flush with the timing chain cover edge.
Apply MP grease to the oil seal lip.
| 2. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY |
Remove any old packing (FIPG) material. Be careful not to drop any oil on the contact surfaces of the timing chain cover, cylinder head and cylinder block.
![]() |
Install a new O-ring onto the LH cylinder head as shown in the illustration.
![]() |
Apply continuous beads of seal packing (diameter 3 to 4 mm (0.12 to 0.16 in.)) to the 4 locations as shown in the illustration.
![]() |
Apply continuous beads of seal packing (diameter 3 to 4 mm (0.12 to 0.16 in.)) to the timing chain cover as shown in the illustration.
![]() |
Align the key way of the oil pump drive rotor with the rectangular portion of the crankshaft timing gear, and slide the timing chain cover into place.
![]() |
Install the timing chain cover with the 24 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.
| Bolt | Length |
| A | 25 mm (0.98 in.) |
| B | 55 mm (2.17 in.) |
| 3. INSTALL OIL FILTER BRACKET SUB-ASSEMBLY |
Install a new gasket and the oil filter bracket with the 3 bolts and 2 nuts.
| 4. INSTALL VVT SENSOR |
![]() |
LH bank side VVT sensor.
Apply a light coat of engine oil to an O-ring of the VVT sensor.
Install the VVT sensor with the bolt.
Connect the VVT sensor connector.
![]() |
Connect the water by-pass hoses No. 4 and No. 5.
![]() |
RH bank side VVT sensor.
Apply a light coat of engine oil to an O-ring of the VVT sensor.
Install the VVT sensor with the bolt.
Connect the VVT sensor connector.
| 5. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY |
Install the camshaft timing oil control valves to each cylinder head, and tighten the 2 bolts.
| 6. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH |
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder head, timing chain cover and cylinder head cover.
![]() |
Apply a continuous bead of seal packing (diameter: 2 to 3 mm (0.08 to 0.12 in.)) to the cylinder head and timing chain cover as shown in the illustration.
Install the seal washers to the bolts.
![]() |
Install the cylinder head cover with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.
| 7. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY RH |
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder head, timing chain cover and cylinder head cover.
![]() |
Apply a continuous bead of seal packing (diameter: 2 to 3 mm (0.08 to 0.12 in.)) to the cylinder head and timing chain cover as shown in the illustration.
Install the seal washers to the bolts.
![]() |
Install the cylinder head cover with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.
| 8. INSTALL IGNITION COIL ASSEMBLY |
| 9. INSTALL INTAKE AIR SURGE TANK |
Install a new gasket to the intake air surge tank.
Using the socket hexagon wrench 8, install the intake air surge tank with the 4 bolts.
Install the 2 intake air surge tank nuts.
Install the 2 surge tank stays with the 4 bolts.
Install the oil baffle plate with the bolt.
Install the throttle body bracket with the 2 bolts.
Install the 3 wire harness clamps and hose clamp.
Connect the throttle body with motor connector.
Connect the 2 VSV connectors.
Connect the ventilation hose.
Connect the fuel vapor feed hose.
Connect the 2 water by-pass hoses.
| 10. INSTALL OIL PAN SUB-ASSEMBLY |
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder block, rear oil seal retainer and oil pan.
![]() |
Install the 4 stud bolts.
![]() |
Install a new O-ring to the oil pump.
![]() |
Apply a continuous bead of seal packing (diameter: 3 to 4 mm (0.12 to 0.16 in.)) to the oil pan as shown in the illustration.
![]() |
Install the oil pan with the 17 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.
| 11. INSTALL OIL STRAINER SUB-ASSEMBLY |
![]() |
Install a new gasket and the oil strainer with the 2 nuts.
| 12. INSTALL NO.2 OIL PAN SUB-ASSEMBLY |
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the oil pan and No. 2 oil pan.
![]() |
Apply a continuous bead of seal packing (diameter: 3 to 4 mm (0.12 to 0.16 in.)) as shown in the illustration.
![]() |
Install the No. 2 oil pan with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.
| 13. INSTALL CRANKSHAFT PULLEY |
![]() |
Using SST, install the pulley set bolt.
| 14. INSTALL NO.1 IDLER PULLEY SUB-ASSEMBLY |
![]() |
Install the idler pulley with the bolt.
| 15. INSTALL NO.2 IDLER PULLEY SUB-ASSEMBLY |
![]() |
Install the 2 idler pulleys with the 2 bolts.
| 16. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY |
![]() |
Temporarily install the V-ribbed belt tensioner with the 5 bolts.
Install the V-ribbed belt tensioner by tightening the bolt 1 and bolt 2 in the order shown in the illustration.
Tighten the other bolts.
| 17. INSTALL COOLER COMPRESSOR ASSEMBLY |
Install the cooler compressor assembly with the 4 bolts.
Connect the cooler compressor assembly connector.
![]() |
Install the suction hose sub-assembly with the bolt.
| 18. REMOVE GENERATOR ASSEMBLY |
Install the generator assembly with the 2 bolts.
Install the wire harness clamp bracket with the 2 bolts.
Connect the wire harness.
Connect the wire harness to the terminal B and install the nut.
Connect the connector to the generator assembly.
Install the wire harness stay with the bolt.
| 19. REMOVE VANE PUMP ASSEMBLY |
![]() |
Install the vane pump with the 2 bolts.
Connect the P/S oil pressure switch connector.
| 20. INSTALL WATER INLET |
![]() |
Install a new O-ring to the water outlet pipe.
Install a new gasket to the water pump.
Apply soapy water to the O-ring.
![]() |
Install the water inlet with the 5 bolts.
Connect the 5 water by-pass hoses.
Connect the 2 radiator hoses.
Connect the 2 oil cooler hoses (with oil cooler).
| 21. INSTALL OIL LEVEL GAUGE GUIDE |
![]() |
Install a new O-ring to the oil level gauge guide.
Apply a light coat of engine oil to the O-ring.
Push in the oil level gauge guide end into the guide hole of the oil pan.
Install the oil level gauge guide with the bolt.
| 22. INSTALL AIR CLEANER ASSEMBLY |
![]() |
Install the air cleaner with the 2 bolts.
Tighten the 2 hose clamps.
![]() |
Install the 2 wire harness clamps.
Connect the mass air flow meter connector.
Connect the vacuum hose.
![]() |
Connect the ventilation hose No. 2.
| 23. CONNECT VENTILATION HOSE NO.2 |
| 24. INSTALL FAN WITH FLUID COUPLING |
Temporarily install the fan with fluid coupling with the 4 nuts.
| 25. INSTALL FAN AND GENERATOR V BELT |
![]() |
While turning the belt tensioner counterclockwise, align with its holes, and then insert a bar of 6 mm (0.24 in.) into the holes to fix the belt tensioner.
Install the V-ribbed belt.
While turning the belt tensioner counterclockwise, remove the bar.
![]() |
If it is hard to install the V-ribbed belt, perform the following procedure.
Put the V-ribbed belt on all parts except the P/S pump, as shown in the illustration.
While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the P/S pump.
| 26. FULLY TIGHTEN FAN WITH FLUID COUPLING |
Tighten the 4 fluid coupling bolts.
| 27. INSTALL RADIATOR SUPPORT SEAL UPPER |
| 28. INSTALL BATTERY |
| 29. INSTALL DIFFERENTIAL CARRIER ASSEMBLY FRONT |
![]() |
Connect the actuator hose and connector.
Install the No. 1 mounting support with the 3 bolts.
Install the No. 2 mounting support with the 2 bolts.
Install the No. 3 front differential support with the 2 bolts.
Support the front differential with a jack.
Install the 2 front mounting bolts and nuts.
Install the No. 1 front differential mount nut.
Install the front differential breather tube bracket with the bolt.
Lower the jack.
| 30. INSTALL POWER STEERING LINK ASSEMBLY |
![]() |
Install the power steering link assembly with the 2 bolts and 2 nuts.
| 31. ADD ENGINE OIL |
Fill with fresh engine oil.
| Drain and refill with oil filter change | 5.2 liters (5.5 US qts, 4.6 lmp. qts) |
| Drain and refill without oil filter change | 4.9 liters (5.2 US qts, 4.3 lmp. qts) |
| Dry fill | 6.0 liters (6.3 US qts, 5.3lmp. qts) |
Reinstall the oil filler cap.
| 32. ADD ENGINE COOLANT |
Slowly fill the system with engine coolant.
Install the radiator cap securely.
Bleed the cooling system.
Open the heater water valve while warming up the engine.
Maintain the engine speed at 2,000 to 2,500 rpm and warm up the engine.
Stop the engine and wait until the coolant cools down.
Add coolant into the reservoir until the coolant level is FULL.
| 33. INSPECT ENGINE OIL LEAKS |
| 34. INSPECT ENGINE COOLANT LEAKAGE |
Fill the radiator with coolant and attach a radiator cap tester.
Pump it to 118 kPa (1.2 kgf/cm2 17.1 psi), then check for leakage.
| 35. INSTALL V-BANK COVER |
Install the V-bank cover with the 2 nuts.